Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Repton ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921 )

Rupavati ( Report of Survey for Repairs, &c for Rupavati, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

29/05/1919 ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

324 ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Steam ( Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921 )

Motor (internal combustion) ( Report on Electric Lighting Installation for Repton, 12th September 1919 1919 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Draft

1917 ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917 )

1919 ( Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919 )

1920 ( Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920 )

1921 ( Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921 )

0000 ( Report of Survey for Repairs, &c for Rupavati, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The year in which a vessel’s construction is completed.

Year of ship completion

1919 ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

A & J Inglis Ltd ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Minesweeper ( Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919 )

Twin Screw Steamer ( Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Memo regarding Classification for Repton, 4th August 1921 1921 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917, Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919, Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920, Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921, Report of Survey for Repairs, &c for Rupavati, Undated no date )

A vessel’s calculated maximum speed.

Speed (knots)

r 1917 ( Request for Special Survey of Boilers for Repton, 19th December 1917 1917 )

1919 ( Plan of Construction Sections for Repton, 9th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Repton, 9th October 1919 1919, Memo to the Chief Ship Surveyor regarding Repton, 25th September 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, Lloyd\'s Register, London, regarding Repton, 23rd September 1919 1919, Steel Steamer Report for Repton, 17th September 1919 1919, Report on Machinery for Repton, 17th September 1919 1919, Report on Boilers for Repton, 21st May 1919 1919, Report on Electric Lighting Installation for Repton, 12th September 1919 1919 )

1920 ( Report of Survey for Repairs, &c for Repton, 28th December 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Repton, 20th December 1920 1920 )

1921 ( Copy of Letter from Secretary, to The Bombay Steam Navigation Co, Bombay, regarding Repton, 4th August 1921 1921, Memo regarding Classification for Repton, 4th August 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Repton, 26th July 1921 1921, Copy of Letter received from the Society\'s Surveyor, Bombay, regarding vessel relating to the case of Repton, 1st July 1921 1921, Copy of Letter from The B S N Co Ltd, The Superintending Engineer, regarding Repton, 28th June 1921 1921 )

ated ( Report of Survey for Repairs, &c for Rupavati, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Name of surveyor.

Type and configuration of the engine(s) supplied for a vessel.

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.