Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The port or place in which the vessel’s construction took place, at the time of writing.
A vessel’s means of propulsion.
undefined ( Midship Section Plan for Rangitoto, 27th August 1864 1864 )
Sail ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Is the steamer assisted by sail?
No ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
The listed port to which a given vessel belongs.
London ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
H J Harris ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AB1; MC ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
The name of the port/place of destination given.
New Zealand ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
449 ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
The year in which a vessel’s construction is completed.
1864 ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Rangitoto, 27th August 1864 1864 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Rangitoto, 27th August 1864 1864, Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
The individual and/or organisation listed
Panama New Zealand; Australia Royal Mail Co ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Location where a vessel’s survey was undertaken.
Glasgow ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Recorded information related to a vessel’s movements.
Glasgow; New Zealand ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Iron Ships Report for Rangitoto, 26th January 1865 1865 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.