Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

Year of ship completion

1921 ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Mitsubishi Zosen Kaisha Ltd ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Nagasaki ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle on Tyne ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919 )

Netherton ( Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920 )

Nagasaki ( Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922 )

Kobe ( Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941 )

Yokohama ( Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Name of ship as recorded on the record

Ship name

Rakuyo Maru ( Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Name recorded as the superintendent of the proving house.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Shelter dk with Fbd; +LMC 5,21; FD; Fitted for Oil Fuel 6,21; FP above 150 F; Lloyds A & CP ( Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921 )

See Minute on FE Report ( Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921 )

+LMC 5,21; FD; Fitted for Oil Fuel 6,21; FP above 150 F ( Report on Machinery for Rakuyo Maru, 6th June 1921 1921 )

Omit Class on Re Print ( Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941 )

+100A1 Shelter; Deck with Freeboard 12,40; Fitted for Oil Fuel 6,21; FP above 150 F; SS Kob No 3-5,36; SS Kob No 1-40; +LMC 3,40; TS (OG) P12,37; 89,39; BS 12,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941 )

The name of the port/place of destination given.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Single Reduction Geared Turbine ( Report on Machinery for Rakuyo Maru, 6th June 1921 1921 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/02/1921 ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

342 ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

undefined ( Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Certificate for Cast Steel Anchor Head for Rakuyo Maru, 26th May 1919 1919, Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920, Plan of Main Boiler for Rakuyo Maru, 27th August 1920 1920, Steel Steamer Report for Rakuyo Maru, 4th June 1921 1921, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificate for Rakuyo Maru, 2nd December 1921 1921, Certificate of Survey of Damage for Rakuyo Maru, 24th November 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 24th November 1921 1921, Certificate of Survey for Rakuyo Maru, 27th June 1921 1921, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 27th June 1921 1921, Certificate of Survey of Boiler & Machinery for Rakuyo Maru, 25th May 1921 1921, Report on Machinery for Rakuyo Maru, 6th June 1921 1921, Memo regarding classification for Rakuyo Maru, 5th August 1921 1921, Memo for Rakuyo Maru, 5th August 1921 1921, Report on Electric Lighting Installation for Rakuyo Maru, 3rd May 1921 1921, Constuction Profile & Deck Plan for Rakuyo Maru, 30th May 1921 1921, Body Plan for Rakuyo Maru, 23rd June 1921 1921, Plan of Lines for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Capacity Curve for Rakuyo Maru, 23rd June 1921 1921, Plan of Curve of Sectional Area for Rakuyo Maru, 23rd June 1921 1921, Capacity Plan with Position of Bulkhead for Rakuyo Maru, 21st June 1921 1921, Plan of Displacement Curve for Rakuyo Maru, 23rd June 1921 1921, Calculation Table of Form, Floodable Length & Etc for Rakuyo Maru, 23rd June 1921 1921, Half Midship Section Plan for Rakuyo Maru, 28th May 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 13th January 1922 1922, Letter from R Crawford, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding shell plating & riveting for Rakuyo Maru, 22nd February 1922 1922, Letter from A S Williamson, Nagasaki Surveyor, to the Secretary for Lloyd\'s Register regarding screwshaft liners for Rakuyo Maru, 23rd February 1922 1922, Freeboard Verification Form for Steamers for Rakuyo Maru, 19th November 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rakuyo Maru, 20th August 1941 1941, Report of Survey for Repairs, &c for Rakuyo Maru, 28th May 1941 1941, Certificate of Survey of Repairs for Rakuyo Maru, 20th May 1941 1941, Certificate of Survey of Part of the Machinery for Rakuyo Maru, 20th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Rakuyo Maru, 28th May 1941 1941, Memo regarding class for Rakuyo Maru, 2nd June 1942 1942, Note regarding the omission of Rakuyo Maru, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Proving House

Lloyd's Proving House Netherton ( Certificate for Test of Anchor for Rakuyo Maru, 20th January 1920 1920 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Physical arrangement of a ship’s masts, sails and rigging.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.