Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Raifuku Maru ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

30/10/1918 ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

427 ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

The port in which a vessel is registered or permanently based.

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

The official record pronounced by the Committee

Loss or disposal

Foundered ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Number of lives lost

48 ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

21/04/1925 ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The year in which a vessel’s construction is completed.

Year of ship completion

1918 ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Kawasaki Dockyard Co Ltd ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Kobe ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

A vessel’s means of propulsion.

Propulsion

Steam ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

undefined ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

In Distress & Sank ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

North Atlantic ( Freeboard Verification Form for Steamers for Raifuku Maru, 22nd October 1918 1918, Certificate of Survey of Repairs for Raifuku Maru, 7th November 1918 1918, Steel Steamer Report for Raifuku Maru, 6th November 1918 1918, Report on Machinery for Raifuku Maru, 18th November 1918 1918, Report on Boilers for Raifuku Maru, 18th November 1918 1918, Report on Electric Lighting Installation for Raifuku Maru, 6th November 1918 1918, Construction Profile & Deck Plans for Raifuku Maru, 5th November 1918 1918, Half Midship Section Plan for Raifuku Maru, 6th November 1918 1918, Letter from A L Jones, to The Secretary, London, regarding Raifuku Maru, 8th May 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Raifuku Maru, 6th February 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Completion of SS No 1 of Raifuku Maru, 28th May 1924 1924, Report of Survey for Repairs, &c for Raifuku Maru, 11th April 1924 1924, Copy of Certificate of Survey of Repairs for Raifuku Maru, 11th April 1924 1924, Certificate of Testing for Raifuku Maru, 23rd April 1924 1924, Steel Test Certificate for Raifuku Maru, 7th February 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Raifuku Maru, 11th April 1924 1924, Report of Total Loss, Casualty, &c for Raifuku Maru, 13th August 1925 1925, Letter from Masaya Abe Director, Kokusai Kisen Kabushiki Kaisha, to The Secretary, The Lloyd\'s Register, London, regarding Raifuku Maru, 12th June 1925 1925 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Type and configuration of the engine(s) supplied for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.