Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Radmanso ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Nordic ( Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914 )
The process of transferring a vessel to water, but not necessarily her completion.
12/06/1914 ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Unique identifier for a given ship, it is assigned by a builder.
504 ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Location where a vessel’s survey was undertaken.
Sunderland ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914 )
Newcastle ( Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914 )
Stockton on Tees; Middlesbrough ( Report on Machinery for Nordic, 15th July 1914 1914 )
Gothenburg ( Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932 )
Bremen ( Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957 )
Bremerhaven; Bremen ( Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
Stockholm ( Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958 )
London; Malmo ( Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958 )
London; Stockholm ( Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958 )
London ( Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
A vessel’s means of propulsion.
Steam ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
undefined ( Letter to White, regarding Nordic, 27th October 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957 )
Is the steamer assisted by sail?
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Is machinery fitted at the aft of the vessel?
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Carl Persson & Soner for Breaking up at Ystad ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Nordic, 24th September 1914 1914 )
Mdb ( Report on Machinery for Nordic, 15th July 1914 1914 )
Got ( Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932 )
Bmn ( Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
The individual and/or organisation listed
Rederiaktieb Transatlantic ( Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932 )
Rederi A/S Rex ( Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
O E W Huldtgren ( Steel Steamer Report for Nordic, 24th September 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Nordic, 24th September 1914 1914 )
The port in which a vessel is registered or permanently based.
Location of construction for a vessel’s engines.
Stockton on Tees ( Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914 )
Stockholm ( Report on Machinery for Nordic, 15th July 1914 1914, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1914 ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J L Thompson & Sons ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Screw Steamer ( Report on Machinery for Nordic, 15th July 1914 1914 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Does the vessel possess an auxiliary power source?
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Is electric lighting fitted to the vessel?
No ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
The official record pronounced by the Committee
To be broken up ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
Vessel’s place of loss or disposal/last known recorded location.
Ystad ( Profile Plan for Radmanso, 10th December 1913 1913, Plan of Rudder for Radmanso, 20th December 1913 1913, Profile Plan for Radmanso, 27th August 1914 1914, Deck Plan for Radmanso, 27th August 1914 1914, Half Midship Section Plan for Nordic, 27th August 1914 1914, Telegram from the Lloyd\'s Surveyors, Sunderland to the Committee of Lloyd\'s Register, London regarding Nordic, 29th September 1914 1914, Letter to White, regarding Nordic, 27th October 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Radmanso , 25th September 1914 1914, Steel Steamer Report for Nordic, 24th September 1914 1914, Freeboard Verification Form for Steamers for Nordic, 6th August 1914 1914, Cover note for First Entry Machinery Report for Nordic, sent to Sunderland, 20th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914, Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914, Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Radmanso, 28th February 1944 1944, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Damage & Wear & Tear of Radmanso, 2nd August 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Letter from M Sagus, Lloyd\'s Register, Stockholm, to The Secretary, London, regarding Radmanso, 29th May 1958 1958, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958, Copy of a Question & Answer Memo between London & Malmo Offices, regarding Radmanso being Breaking up, 19th May 1958 1958, Question & Answer Memo between London & Stockholm Offices, regarding Radmanso being Boiler Survey, 20th March 1958 1958, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Stockholm, regarding Radmanso, 6th February 1958 1958, Form of Postponed Surveys for Radmanso, 4th February 1958 1958, Letter from per The Surveyors, to The Secretary, London, regarding Radmanson, 29th January 1958 1958, Copy of a Letter from R N Cook, Clerk to the Classification Committee, to Rederi A/B Rex, Stockholm, regarding Radmanso, 2nd January 1958 1958 )
The listed port to which a given vessel belongs.
Gothenburg ( Steel Steamer Report for Nordic, 24th September 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W R Lundgren ( Steel Steamer Report for Nordic, 24th September 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914 )
G Carlsson ( Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932 )
Ragnar Kallstrom ( Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk With Fbd; Lloyd's A & CP; +LMC 9,14 ( Steel Steamer Report for Nordic, 24th September 1914 1914 )
+LMC 9,14 ( Report on Machinery for Nordic, 15th July 1914 1914 )
+100A1; SS Got No 3-5,26; SS Got No 1-29; Shelter Dk W Freeb ( Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932 )
+100A1 Shelter Deck With Freeboard; SS (Dr) 10/49; SS Osk 2/54; DS 6/56; +LMC 4/51; BS 7/56; TS OG 3/54 ( Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
+100A1; Shelter Dk With Fbd 6,57; SS (Dr) 10,49; Osk 2,54; +LMC 2,54; BS M 6,57; TS 6,57 CL ( Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4136 ( Steel Steamer Report for Nordic, 24th September 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914 )
4280 ( Report of Surveys for Freeboard for Radmanso, 31st August 1932 1932 )
4265 ( Copy of a Certificate of Survey of Part Boilers & Part Machinery for Radmanso, 17th July 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957, Report of Total Loss, Casualty, &c for Radmanso, 22nd May 1958 1958 )
Name of surveyor.
William Campbell; William Morrison ( Engine Forgings Form for Nordic, 13th July 1914 1914, Engine Forgings Form for Nordic, 13th July 1914 1914 )
William Morrison ( Copy of a Letter from William Morrison, to The Surveyors, Sunderland, regarding Nordic, 11th July 1914 1914, Report on Machinery for Nordic, 15th July 1914 1914 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound ( Report on Machinery for Nordic, 15th July 1914 1914 )
T 3 Cylinders ( Report of Periodical Surveys & Repairs of Machinery for Radmanso, 23rd July 1957 1957 )
Have you noticed missing or incorrect data or images for this ship?