Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
R W Gallagher ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
The process of transferring a vessel to water, but not necessarily her completion.
22/01/1938 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Unique identifier for a given ship, it is assigned by a builder.
4307 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Location where a vessel’s survey was undertaken.
Sparrows Point Maryland ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936 )
London ( Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938 )
Sparrows Point, Maryland; Baltimore, Maryland ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938 )
Baltimore, Maryland ( Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938 )
Boston, Mass; New York ( Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938 )
New York ( Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942 )
Newport News, Va ( Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
A vessel’s means of propulsion.
undefined ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942 )
Steam ( Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Is the steamer assisted by sail?
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Recorded date for the vessel’s loss or disposal.
15/07/1942 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Oil Fuel in Bulk ( Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bal ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938 )
N.Yk ( Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938 )
N.Ns ( Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
The individual and/or organisation listed
Standard Oil Co of New Jersey ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Type and configuration of the engine(s) supplied for a vessel.
Steam Turbine ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938 )
Cross Compound Impulse Reaction Type Turbine ( Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938 )
Location of construction for a vessel’s engines.
Quincy, Mass ( Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
The year in which a vessel’s construction is completed.
1938 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bethlehem Shipbuilding Corp Ltd ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
The port or place in which the vessel’s construction took place, at the time of writing.
Sparrows Point, Maryland ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Screw Steamer ( Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938 )
Tanker ( Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Does the vessel possess an auxiliary power source?
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Is electric lighting fitted to the vessel?
No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 Carrying petroleum in bulk ( Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938 )
+100A1 Carrying Petroleum in Bulk; Fitted for Oil Fuel 8,38 FP above 150 F; +LMC 5,38 ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938 )
+LMC 8,38 ( Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938 )
See Bal Rpt 6600 ( Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938 )
2 WTB (Spt) 450 lbs ( Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938 )
Elec Light ( Report on Electric Fittings for R W Gallagher, 8th August 1938 1938 )
+100A1 5,42; LMC 8,38; BS 5,42; TS 7,41 CL; Carrying Oil Fuel in Bulk; Fitted for Oil Fuel 8,38; FP above 150F; 2 WT BS ( Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942 )
+100A1 Carrying Petroleum in Bulk; Fitted for Oil Fuel 8,38 FP above 150 F; BS 5,42 ( Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942 )
BS 5,42 ( Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
WPKP ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938 )
The port in which a vessel is registered or permanently based.
Wilmington, De ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7989 ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
The listed port to which a given vessel belongs.
Wilmington, De ( Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942 )
Date in which construction of a vessel’s engines were completed.
1937 ( Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938 )
1938 ( Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.