Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

R W Gallagher ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

22/01/1938 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

4307 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Location where a vessel’s survey was undertaken.

Location of Survey

Sparrows Point Maryland ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936 )

London ( Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938 )

Sparrows Point, Maryland; Baltimore, Maryland ( Steel Steamer Report for R W Gallagher, 29th August 1938 1938 )

Baltimore, Maryland ( Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938 )

Boston, Mass; New York ( Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938 )

New York ( Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942 )

Newport News, Va ( Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

A vessel’s means of propulsion.

Propulsion

undefined ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942 )

Steam ( Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

15/07/1942 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

The year in which a vessel’s construction is completed.

Year of ship completion

1938 ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Bethlehem Shipbuilding Corp Ltd ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sparrows Point, Maryland ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Screw Steamer ( Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938 )

Tanker ( Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Plan of Upper Deck Plating-Midship for R W Gallagher, 28th October 1936 1936, Plan of Shell Expansion Midships for R W Gallagher, 8th October 1936 1936, Plan of Transverses for R W Gallagher, 24th September 1936 1936, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, enclosing hull & machinery certificates for R W Gallagher, 20th October 1938 1938, Letter from the Clerk to the Classification Committee, London, to William Bennett Esq, Principal Surveyor for US & Canada, New York, regarding proposed deferral of class for R W Gallagher, 22nd September 1938 1938, Memo to the Chief Ship Surveyor regarding First Entry Survey for R W Gallagher, 15th September 1938 1938, Steel Steamer Report for R W Gallagher, 29th August 1938 1938, Certificate of Survey for R W Gallagher, 8th August 1938 1938, Certificate of Survey of Boilers & Machinery for R W Gallagher, 8th August 1938 1938, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for R W Gallagher, 5th October 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 12th August 1938 1938, Report on Steam Turbine Machinery for R W Gallagher, 17th January 1938 1938, Report on Water Tube Boilers for R W Gallagher, 12th August 1938 1938, Report on Electric Fittings for R W Gallagher, 8th August 1938 1938, Report of Total Loss, Casualty, &c for R W Gallagher, Undated 1942, Extract from a letter received from New York Office regarding the adjustment of safety valves for R W Gallagher 1942, Memo to the Chief Ship Surveyor regarding the 1st No 1 Survey Commenced for R W Gallagher, 16th June 1942 1942, Report of Survey for Repairs, &c for R W Gallagher, 4th May 1942 1942, Certificate of Survey of Repairs for R W Gallagher, 5th May 1942 1942, Certificate of Survey of Boilers & Part Machinery for R W Gallagher, 5th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for R W Gallagher, 4th May 1942 1942 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.