Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Puffin ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
23/11/1907 ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
107 ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Report on Machinery for Puffin, 31st December 1907 1907, Steel Steamer Report for Puffin, 9th January 1908 1908 )
Lon ( Report of Survey for Repairs, &c for Puffin, Undated no date )
The individual and/or organisation listed
Kelsall Bros & Beeching Co Ltd ( Report on Machinery for Puffin, 31st December 1907 1907, Steel Steamer Report for Puffin, 9th January 1908 1908, Report of Survey for Repairs, &c for Puffin, Undated no date )
Kelsall Bros & Beeching Ltd ( Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Memo for Puffin, 3rd February 1912 1912 )
Location where a vessel’s survey was undertaken.
Goole; Hull ( Report on Machinery for Puffin, 31st December 1907 1907, Steel Steamer Report for Puffin, 9th January 1908 1908 )
Hull ( Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912 )
Sunderland ( Ship Forgings Form for Puffin, 13th September 1907 1907 )
Goole ( Midship Section Plan for Puffin, 24th October 1907 1907 )
London ( Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Steel Steamer Report for Puffin, 9th January 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
Hull ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Is electric lighting fitted to the vessel?
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
The port in which a vessel is registered or permanently based.
Hull ( Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907 )
Recorded information related to a vessel’s movements.
Goole; Fishing ( Steel Steamer Report for Puffin, 9th January 1908 1908 )
The year in which a vessel’s construction is completed.
1907 ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Goole Shipbuilding & Repairing Co Ltd ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Goole ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
The listed port to which a given vessel belongs.
Name of surveyor.
James Barclay ( Report on Machinery for Puffin, 31st December 1907 1907 )
Jervis Dale; Frank Cook ( Ship Forgings Form for Puffin, 13th September 1907 1907 )
Allison B Wilson ( Steel Steamer Report for Puffin, 9th January 1908 1908 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 12,07 ( Report on Machinery for Puffin, 31st December 1907 1907 )
+100A1; Stm Trawler; Lloyds A & CP; +LMC 12,07 ( Steel Steamer Report for Puffin, 9th January 1908 1908 )
Omit Class on Reprint of RB ( Report of Survey for Repairs, &c for Puffin, Undated no date )
A vessel’s means of propulsion.
undefined ( Report on Machinery for Puffin, 31st December 1907 1907, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Steam ( Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912 )
Is the steamer assisted by sail?
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Puffin, 31st December 1907 1907 )
Reciprocating Triple Compound Direct Acting Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907 )
Date in which construction of a vessel’s engines were completed.
Is machinery fitted at the aft of the vessel?
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report on Machinery for Puffin, 31st December 1907 1907, Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907, Ship Forgings Form for Puffin, 13th September 1907 1907, Midship Section Plan for Puffin, 24th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Puffin, 10th January 1908 1908, Steel Steamer Report for Puffin, 9th January 1908 1908, Copy of Letter from Secretary, to Kelsall Bros & Beeching Ltd, Hull, regarding Puffin, 6th February 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First SS No 1 for Puffin, 5th February 1912 1912, Letter from p pro Caces Burqoyac Hp, Assistant, Kelsall Bros & Beeching Ltd, to Lloyds Register of British & Foreign Shipping, London, regarding Puffin, 2nd February 1912 1912, Memo for Puffin, 3rd February 1912 1912, Report of Survey for Repairs, &c for Puffin, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
George Beeching; John Edmund Ambrose Kelsall ( Form for Vessels of 100 Tons & Upwards for Puffin, 28th December 1907 1907 )
G Beeching & J E A Kelsall ( Report of Survey for Repairs, &c for Puffin, Undated no date )
The name of the port/place of destination given.
Fishing ( Steel Steamer Report for Puffin, 9th January 1908 1908 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.