Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The individual and/or organisation listed

Ship owner

Sailing Ship Primrose Hill Co Ltd ( Iron Ship Report for Primrose Hill, 27th March 1886 1886 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Location where a vessel’s survey was undertaken.

Recorded information related to a vessel’s movements.

Voyage information

Liverpool; Cardiff; Panama ( Iron Ship Report for Primrose Hill, 27th March 1886 1886 )

Physical arrangement of a ship’s masts, sails and rigging.

Predominant material(s) utilised in a vessel’s construction.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

The listed port to which a given vessel belongs.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Name of surveyor.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Record; +Cemt/86; Lloyds A & CP also Freeboard ( Iron Ship Report for Primrose Hill, 27th March 1886 1886 )

The name of the port/place of destination given.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.