Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Gruinard ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943 )

President F D Roosevelt ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950 )

Odin ( Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

20/11/1942 ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

205 ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Trawler ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950 )

undefined ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The year in which a vessel’s construction is completed.

Year of ship completion

1943 ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Crown & Sons Ltd ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Sunderland ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943 )

Hull ( Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943 )

West Hartlepool; Hartlepool ( Report on Boilers for Gruinard, 12th January 1943 1943 )

London ( Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Report of Survey for Repairs, &c for Odin, Undated no date )

Bremerhaven ( Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950 )

Antwerp ( Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950 )

London; Antwerp ( Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950 )

Genoa ( Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957 )

A vessel’s means of propulsion.

Propulsion

undefined ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950 )

Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Report of Survey for Repairs, &c for Odin, Undated no date )

Motor (internal combustion) ( Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey for Gruinard, 22nd October 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of President F D Roosevelt, 22nd March 1943 1943, Steel Steamer or Motorship Report for Gruinard, 13th March 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Gruinard, 22nd March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 9th March 1943 1943, Report on Steam Reciprocating Engine Machinery for Gruinard, 6th February 1943 1943, Report on Boilers for Gruinard, 12th January 1943 1943, Report on Electrical Equipment for Gruinard, 5th March 1943 1943, Copy of Letter from Assistant Clerk to the Classification Committee, to J P Gateley Esq, Bremerhaven, regarding President F D Roosevelt, 28th July 1950 1950, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding President F D Roosevelt, 17th July 1950 1950, Letter to The Secretary, London, regarding President F D Roosevelt, 26th June 1950 1950, Copy of Letter regarding President F D Roosevelt, 13th June 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 10th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 5th June 1950 1950, Question & Answer Memo between London & Antwerp Office, regarding President F D Roosevelt being Boiler Survey, 25th April 1950 1950, Letter from H C Murray, per The Surveyors, to The Secretary, London, regarding President F D Roosevelt, 7th June 1950 1950, Letter from A Ansaldo, for The Surveyors, to The Secretary, London, regarding Odin, 6th September 1957 1957, Report of Survey for Repairs, &c for Odin, Undated no date )

The listed port to which a given vessel belongs.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.