Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Portavon ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Barra Head ( Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
16/01/1930 ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
265 ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sou ( Report on Machinery for Portavon, 7th August 1920 1920 )
Nwc ( Report on Boilers for Portavon, 8th February 1926 1926 )
Hul ( Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Lth ( Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932 )
Abn ( Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Hul FE 40621 ( Report on Machinery for Portavon, 7th August 1920 1920, Report on Boilers for Portavon, 8th February 1926 1926 )
+100A1; Lloyd\'s A & CP; +LMC 2,30; CL; Cargo Battens not Fitted ( Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930 )
+LMC 2,30; CL ( Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930 )
See Other FE Rpt ( Report on Boilers for Portavon, 24th February 1930 1930 )
+100A1 5,31; +LMC 2,30; CL; Cargo Battens not fitted ( Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931 )
+100A1 ( Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932 )
+100A1 8,60; S S (Dr) 9,56; +LMC 9,56; BS M10,60; Sp 9,56; TS 10,59; CL ( Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961 )
Deferred for SS (by 9,61) & for Dry Docking ( Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961 )
+100A1 (Contemplated) ( Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date )
+100A1 Cont (Revised Rules) ( Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
A vessel’s means of propulsion.
undefined ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date )
Steam ( Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Is the steamer assisted by sail?
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Location of construction for a vessel’s engines.
Southampton ( Report on Machinery for Portavon, 7th August 1920 1920, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930 )
Hull ( Engine Forgings Form for Portavon, 29th December 1925 1925 )
Northam ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Is electric lighting fitted to the vessel?
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
The official record pronounced by the Committee
To be broken up ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Tyne ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
The port in which a vessel is registered or permanently based.
Cardiff ( Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
Leith ( Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961 )
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
LFNJ ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
The listed port to which a given vessel belongs.
The year in which a vessel’s construction is completed.
1930 ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Goole Shipbuilding & Repairing (1927) Co Ltd ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Goole ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Location where a vessel’s survey was undertaken.
Southampton ( Report on Machinery for Portavon, 7th August 1920 1920 )
Goole ( Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925 )
Hebburn on Tyne ( Plan of Main Boiler for Portavon, 1925 1925 )
Hull ( Request for Special Survey for Portavon, 20th July 1925 1925, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Sunderland ( Engine Forgings Form for Portavon, 29th December 1925 1925 )
Hebburn; Newcastle ( Report on Boilers for Portavon, 8th February 1926 1926 )
West Hartlepool ( Engine Forgings or Castings Form for Portavon, 4th October 1927 1927 )
Goole; Hull ( Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930 )
Cardiff ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
London ( Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961 )
Leith ( Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961 )
London; Glasgow ( Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961 )
Aberdeen ( Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961 )
Inverness; Aberdeen ( Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Cargo ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Surface Condensing ( Report on Machinery for Portavon, 7th August 1920 1920 )
Direct Acting Triple Expansion Marine Type ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
Triple Expansion ( Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930 )
Date in which construction of a vessel’s engines were completed.
Is machinery fitted at the aft of the vessel?
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to British Iron & Steel Corp for Breaking up at Tyne ( Report on Machinery for Portavon, 7th August 1920 1920, Plan of Stern Tube & Shafting for Barra Head, 29th June 1925 1925, Plan of Main Boiler for Portavon, 1925 1925, Profile & Deck Plan for Portavon, 19th January 1925 1925, Midship Section Plan for Portavon, 16th January 1925 1925, Memo about the Freeboard Report for Portavon, 6th February 1925 1925, Request for Special Survey for Portavon, 20th July 1925 1925, Engine Forgings Form for Portavon, 29th December 1925 1925, Report on Boilers for Portavon, 8th February 1926 1926, Engine Forgings or Castings Form for Portavon, 4th October 1927 1927, Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Letter from George H Macadam, per The Surveyors, to the Secretary of Lloyd's Register regarding Portavon, 11th February 1930 1930, Memo about the Freeboard Report for Portavon, 20th January 1930 1930, Freeboard Application for Certificate of Approval for Portavon, 9th January 1930 1930, Letter from John H Mackirdy, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st March 1930 1930, Letter from W Malcolm, per The Surveyors, to the Secretary of Lloyd\'s Register regarding Portavon, 1st February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Portavon, 26th February 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Memo for Portavon, 26th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Copy of Letter from the Secretary of Lloyd's Register, to The Assistant Secretary, Mercantile Marine Department, regarding Barra Head, 7th July 1931 1931, Letter from T W Revans, Assistant to Chief Ship Surveyor, to the Secretary of Lloyd's Register regarding Barra Head, 6th July 1931 1931, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Copy of Letter from Deputy Clerk to the Classification Committee, to The Newcastle on Tyne Surveyors, regarding Barra Head, 8th August 1961 1961, Letter from J Phillip, Marine Superintendent, A F Henry & MacGregor Ltd, to the Secretary of Lloyd's Register regarding Barra Head, 21st July 1961 1961, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Question & Answer Memo between London & Glasgow Offices, regarding Main Boiler Survey became due for Barra Head, 21st July 1961 1961, Memo to the Chief Ship Surveyor regarding Examination afloat after grounding for Barra Head, 22nd March 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961, Copy of Freeboard Report for Barra Head, Undated no date, Freeboard & Draught Document for Portavon, Undated no date, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date, Report of Surveys for Freeboard-Steam Ships for Portavon, Undated no date )
The individual and/or organisation listed
Portfield Steamship Co Ltd ( Freeboard Verification Form for Steamers for Portavon, 31st January 1930 1930, Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date )
A F Henry & MacGregor Ltd ( Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W E Hinde & Co ( Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930 )
William Edward Hinde ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
W E Hinde ( Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
671 ( Steel Steamer or Motorship Report for Portavon, 11th February 1930 1930, Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930, Report on Steam Reciprocating Engine Machinery for Portavon, 24th February 1930 1930, Report on Boilers for Portavon, 24th February 1930 1930, Report of Survey for Repairs, &c for Barra Head, 27th August 1931 1931, Report of Surveys for Freeboard for Barra Head, 24th June 1932 1932, Report of Total Loss, Casualty, &c for Barra Head, 26th July 1961 1961, Copy of a Certificate of Survey for Barra Head, 2nd March 1961 1961, Report of Ship Surveys & Repairs for Barra Head, 28th February 1961 1961 )
652 ( Report of Surveys for Freeboard-Steam Ships for Barra Head, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John McConnell ( Form for Vessels of 100 Tons & Upwards for Portavon, 4th February 1930 1930 )
Name of surveyor.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.