Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Port Denison ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

18/09/1919 ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

352 ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Leeds; Belfast ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916 )

Glasgow ( Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917 )

London ( Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928 )

Belfast ( Steel Steamer Report for Port Denison, 12th May 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918 )

Middlesbrough ( Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Engine Castings Form for Port Denison, 22nd April 1929 1929 )

Newcastle on Tyne ( Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929 )

Newcastle ( Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929 )

Motherwell ( Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929 )

Wallsend; Newcastle ( Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929 )

Darlington ( Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929 )

Walker; Newcastle ( Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929 )

Methil; Leith ( Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Sunk by aircraft ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Scotland ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1 Shelter Dk with Fbd; Lloyds A & Cp; +LMC 5,18 FD; Cargo Battens not Fitted in Shelter tween Decks ( Steel Steamer Report for Port Denison, 12th May 1918 1918 )

+LMC 5,18; FD ( Report on Machinery for Port Denison, 14th May 1918 1918 )

+100A1 Shelter DK WFbd; +LMC 5,29; S 5,29; Cargo Battens not Fitted in shelter Tween Dks ( Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929 )

+LMC 5,29 ( Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929 )

See Nwc Rpt 9 Attached ( Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929 )

B S 9,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940 )

+100A1; Shelter Deck; With Freeboard; 2,40; S S Lon No 3-4,30; S S Gls No 2-39; +LMC; B S 6,39; MS 8,38; TS 7,37 CL ( Report of Total Loss, Casualty, &c for Port Denison, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1918 ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Workman Clark & Co ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Steam ( Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Attacked by Aircraft; subsequently sank ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

Attacked by Aircraft off ( Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

29/09/1940 ( Consignment note for materials manufactured by Deightons Patent Flue & Tube Co Ltd for Port Denison, 8th September 1917 1916, Copy of Half Midship Section Plan for Port Denison, 1916 1916, Engine Castings Form for Port Denison, 24th August 1917 1917, Engine Castings Form for Port Denison, 24th February 1917 1917, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary regarding work required to complete special survey for the classification of Port Denison, 16th May 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding what is needed to complete the survey for Port Denison, 16th May 1918 1918, Steel Steamer Report for Port Denison, 12th May 1918 1918, Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918, Report on Machinery for Port Denison, 14th May 1918 1918, Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918, Letter from the Secretary for Lloyd's Register, London, to the Belfast Surveyors requesting approved plan of after peak framing for Port Denison, 16th May 1918 1918, Engine Castings Form for Port Denison, 13th October 1928 1928, Engine Castings Form for Port Denison, 22nd October 1928 1928, Engine Forgings or Castings Form for Port Denison, 4th October 1928 1928, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plans showing thrust, wheel & intermediate shafts & loose couplings for Port Darwin, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Melbourne, 23rd November 1928 1928, Memo regarding approval of plan showing thrust, wheel & intermediate shafts & loose couplings for Port Denison, 23rd November 1928 1928, Letter from Frederick A Ferguson, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, submitting blue prints showing thrust shafts, wheel shafts & coupling pieces for Port Darwin, 17th November 1928 1928, Letter from Secretary of Lloyd's Register to The Surveyor, Newcastle on Tyne, regarding particulars for Port Denison, 24th August 1928 1928, Request for Surveyor's Services for Port Denison, 22nd August 1928 1928, Letter from John M Murray, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding plans showing alterations regarding Bauer Wach Turbines for Port Denison, 29th July 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Port Denison, 31st May 1929 1929, Report of Survey for Repairs, &c for Port Denison, 25th May 1929 1929, Test of Material & Workmanship of Corrugated Furnace Manufactured by John Marshall & Co for Port Denison, 22nd April 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 22nd May 1929 1929, Results of Tests of Steel for Port Denison Undertaken by M Robertson at The Darlington Forge Ltd, 30th January 1929 1929, Engine Forgings Form for Port Denison, 30th January 1929 1929, Engine Forgings Form for Port Denison, 22nd March 1929 1929, Engine Castings Form for Port Denison, 22nd April 1929 1929, Report on Steam Turbine Machinery for Port Denison, 22nd May 1929 1929, Plan of Thrust Shaft, Wheel Shaft & Coupling Piece for Port Denison, 24th January 1929 1929, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Port Denison, 14th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Port Denison, 27th September 1940 1940, Report of Total Loss, Casualty, &c for Port Denison, Undated no date, Press copy of letter regarding Port Denison, undated no date, Press Copy of Letter from Surveyor G D Ritchie, regarding Port Denison, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

The port in which a vessel is registered or permanently based.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion Surface Condensing Inverted Vertical Direct Acting ( Form for Vessels of 100 Tons & Upwards for Port Denison, 29th April 1918 1918 )

Twin Screw Triple Expansion ( Report on Machinery for Port Denison, 14th May 1918 1918 )

Vertical Open Type Single Cylinder Steam Engine ( Report on Electric Lighting Installation for Port Denison, 30th April 1918 1918 )