Name of ship as recorded on the record
Pioneer ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1854 ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
The listed port to which a given vessel belongs.
London ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William John Wade ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Location where a vessel’s survey was undertaken.
Newcastle ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Recorded information related to a vessel’s movements.
Newcastle; London ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The year in which a vessel’s construction is completed.
1854 ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Palmer Bros & Co ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
General Steam Navigation Co ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Name of surveyor.
Samuel Pretious ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 Built of Iron MC ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
The name of the port/place of destination given.
London ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
A vessel’s means of propulsion.
Steam ( Iron Ships Report for Pioneer, 25th March 1854 1854 )
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?