Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
War Bittern ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Patagonier ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Plan of New Fore Mast for Patagonier, Undated no date )
Perseus ( Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
14/03/1918 ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Unique identifier for a given ship, it is assigned by a builder.
535 ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Location where a vessel’s survey was undertaken.
Sheffield ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918 )
Glasgow ( Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918 )
Belfast ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918 )
London ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941 )
Sunderland ( Ship Forgings Form for War Bittern, 21st March 1918 1918 )
Antwerp ( Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930 )
Port Natal ( Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
A vessel’s means of propulsion.
Steam ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date )
undefined ( Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Is the steamer assisted by sail?
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Does the vessel possess an auxiliary power source?
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Is electric lighting fitted to the vessel?
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
The official record pronounced by the Committee
Sunk ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Vessel’s place of loss or disposal/last known recorded location.
Freetown ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Name of surveyor.
Alexander Fletcher ( Ship Forgings Form for War Bittern, 23rd October 1917 1917, Ship Forgings Form for War Bittern, 30th January 1918 1918 )
Peter McGregor ( Engine Castings Form for War Bittern, 11th August 1917 1917 )
James Stirling ( Engine Castings Form for War Bittern, 18th May 1918 1918 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JSWG ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918 )
The listed port to which a given vessel belongs.
London ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918 )
Antwerp ( Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929 )
Argostoli ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Anchor Line Henderson Bros Ltd ( Steel Steamer Report for War Bittern, 16th April 1918 1918 )
Algernon Charles Francis Henderson ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918 )
A Andreatos ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyd's A & CP +LMC 4,18 F D; Cargo Battens not Fitted in Tween Dks; Carrying Oil Fuel ( Steel Steamer Report for War Bittern, 16th April 1918 1918 )
+LMC 4,18; F D ( Report on Machinery for War Bittern, 19th April 1918 1918 )
+100A1 Subject; +LMC 12,29 ( Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929 )
+LMC 12,29 With in Spl Cond ( Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929 )
Deferred for BS; +100A1 Subject ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941 )
Deferred; +100A1; +LMC 6,38 ( Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
+100A1 4,39; S S No 3-6,38; +LMC 6,38; BS 11,39; TS 5,38; Cl ( Report of Total Loss, Casualty, &c for Perseus, Undated no date )
The port in which a vessel is registered or permanently based.
London ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918 )
Type and configuration of the engine(s) supplied for a vessel.
Inverted Direct acting Triple Expansion Condensing ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918 )
Single Screw Triple Expansion ( Report on Machinery for War Bittern, 19th April 1918 1918 )
Recorded information related to a vessel’s movements.
Bahia Blanca; Las Palmas ( Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929 )
Antwerp; China ( Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929 )
Port Natal; United Kingdom ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
The year in which a vessel’s construction is completed.
1918 ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Screw Steamer ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929 )
Cargo ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Location of construction for a vessel’s engines.
Belfast ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
Is machinery fitted at the aft of the vessel?
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Raider ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Recorded date for the vessel’s loss or disposal.
14/02/1941 ( Engine Forgings Form for War Bittern, 6th November 1917 1917, Results of Tests for War Bittern undertaken by J Pringle at Harland & Wolf, 6th November 1917 1917, Ship Castings Form for War Bittern, 27th September 1917 1917, Ship Forgings Form for War Bittern, 23rd October 1917 1917, Engine Castings Form for War Bittern, 11th August 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Patagonier, 22nd April 1918 1918, Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918, Engine Forgings Form for War Bittern, 19th January 1918 1918, Engine Forgings Form for War Bittern, 25th February 1918 1918, Ship Castings Form for War Bittern, 24th January 1918 1918, Ship Forgings Form for War Bittern, 21st March 1918 1918, Ship Forgings Form for War Bittern, 30th January 1918 1918, Engine Castings Form for War Bittern, 18th May 1918 1918, Cover note for First Entry Report & Plans for Patagonier, sent to Antwerp 7th February 1923 1923, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Antwerp, regarding the mast for Patagonier, 16th July 1929 1929, Memo regarding the fore mast for Patagonier, 16th July 1929 1929, Letter from C H L Pilditch, per The Surveyors, Lloyd\'s Register, Antwerp to The Secretary, Lloyd\'s Register, London, regarding the fore mast for Patagonier, 10th July 1929 1929, Report on Masts, Spars, & Rigging for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Ship Castings Form for Patagonier, 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Letter from John Thomson, per The Surveyors, Lloyd's Register, Antwerp to The Secretary, Lloyd's Register, London, regarding the condenser for Patagonier, 27th January 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to & part 1st SS No 3 for Patagonier, 17th January 1930 1930, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Memo regarding the condenser for Patagonier, 30th January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Secretary, Lloyd's Register, Wokingham, regarding the loss of Perseus, 7th March 1941 1941, Letter from pro Secretary, Lloyd's Register, Wokingham to Lykiardopulo & Co Ltd, London, regarding the loss of Perseus, 5th March 1941 1941, Letter from P G Scarlater, Director, For & on behalf of Lykiardopulo & Co Ltd, London to Lloyd's Register, Wokingham, regarding the sinking of Perseus, 25th February 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the repairs to Perseus, 25th February 1941 1941, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date, Plan of New Fore Mast for Patagonier, Undated no date, Letter from James Stirling, regarding the pipes for War Bittern, 9th November no date )
Recorded information relating the specific cargo being conveyed.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918 )
Ant ( Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929 )
P.Nl ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
The individual and/or organisation listed
The Shipping Controller ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report on Electric Lighting Installation for War Bittern, 27th May 1918 1918 )
Lloyd Royal Belge Soc Anon ( Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929 )
A Andreatos ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W Rome ( Steel Steamer Report for War Bittern, 16th April 1918 1918 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5178 ( Steel Steamer Report for War Bittern, 16th April 1918 1918, Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918 )
5172 ( Report of Survey for Repairs, &c for Patagonier, 28th December 1929 1929, Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929, Certificate of Survey of Machinery & Damage for Patagonier, 31st December 1929 1929, Certificate of Testing for Patagonier, 26th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Certificate of Survey of Damage & Repairs for Patagonier, 2nd January 1930 1930, Certificate of Survey of Repairs for Perseus, 28th December 1940 1940, Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941, Report of Total Loss, Casualty, &c for Perseus, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
Sp - Sloop ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918 )
Date in which construction of a vessel’s engines were completed.
1918 ( Form for Vessels of 100 Tons & Upwards for War Bittern, 6th April 1918 1918, Report on Machinery for War Bittern, 19th April 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
The name of the port/place of destination given.
Las Palmas ( Certificate of Survey of Damage for Patagonier, 2nd January 1929 1929 )
China ( Report of Survey for Repairs, &c, of Engines & Boilers for Patagonier, 26th December 1929 1929 )
United Kingdom ( Report of Survey for Repairs, &c for Perseus, 18th January 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Perseus, 18th January 1941 1941 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.