Name of ship as recorded on the record

Ship name

Peri ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/12/1868 ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

South Shields ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Name of surveyor.

Surveyor

Thomas Luke ( Iron Ships Report for Peri, 4th January 1869 1869 )

William J Bone ( Annual Surveys Report for Peri, 19th April 1870 1870 )

Richard J Reed ( Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877 )

Thomas H Cooke ( Report of Survey for Repairs for Peri, 13th May 1873 1873 )

Thomas Congdon ( Survey Report for Peri, 11th January 1878 1878 )

Charles Fowling ( Report of Survey for Repairs, &c for Peri, 20th March 1885 1885 )

Charles H Jordan ( Report of Survey for Repairs, &c for Peri, 24th June 1887 1887 )

George P Cooper ( Report of Survey for Repairs, &c for Peri, 6th December 1888 1888 )

Thomas L Gray; George Stanbury ( Report of Survey for Repairs, &c for Peri, 12th November 1889 1889 )

James H Truscott; Henri Wilkinson ( Report of Survey for Repairs, &c for Peri, 30th September 1890 1890 )

James H Truscott ( Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893 )

Thomas L Gray ( Report of Survey for Repairs, &c for Peri, 25th July 1892 1892 )

E J Milton ( Report of Survey for Repairs, &c for Peri, 12th September 1894 1894 )

William Moverly ( Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895 )

Edward John Tierney ( Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897 )

Edward John Tierney; William Moverly ( Report of Survey for Repairs, &c for Peri, 15th November 1898 1898 )

Recorded information related to a vessel’s movements.

Physical arrangement of a ship’s masts, sails and rigging.

Rig

S - Ship ( Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Report of Survey for Repairs for Peri, 13th May 1873 1873 )

Bk - Barque ( Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898 )

The year in which a vessel’s construction is completed.

Year of ship completion

1868 ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Readhead, Softley & Co ( Half Midship Section Plan for Peri, 1st July 1868 1868, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Readhead & Co ( Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885 )

Readhead Softley & Co ( Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898 )

Location where a vessel’s survey was undertaken.

Location of Survey

South Shields ( Half Midship Section Plan for Peri, 1st July 1868 1868 )

South Shields; Newcastle ( Iron Ships Report for Peri, 4th January 1869 1869, Report of Survey for Repairs for Peri, 13th May 1873 1873 )

Shields; Newcastle ( Annual Surveys Report for Peri, 19th April 1870 1870 )

Newcastle ( Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877 )

London ( Annual Surveys Report for Peri, 21st December 1875 1875, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898 )

Glasgow ( Report of Survey for Repairs, &c for Peri, 20th March 1885 1885 )

A vessel’s means of propulsion.

Propulsion

Sail ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Half Midship Section Plan for Peri, Undated no date )

Steam ( Annual Surveys Report for Peri, 28th March 1871 1871 )

undefined ( Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Peri, 1st July 1868 1868, Iron Ships Report for Peri, 4th January 1869 1869, Annual Surveys Report for Peri, 19th April 1870 1870, Annual Surveys Report for Peri, 28th March 1871 1871, Report of Survey for Repairs for Peri, 13th May 1873 1873, Annual Surveys Report for Peri, 21st December 1875 1875, Report of Survey for Repairs, &c for Peri, 15th January 1877 1877, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889, Report of Survey for Repairs, &c for Peri, 30th September 1890 1890, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 12th September 1894 1894, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897, Report of Survey for Repairs, &c for Peri, 15th November 1898 1898, Remarks of the Chief Surveyor to the Classing Committee regarding Second SS No 3 of Peri, 16th November 1898 1898, Memo from The Secretary of Lloyd\'s, to J Stewart & Co, London, regarding Peri, 16th September 1898 1898, Memo regarding Classification for Peri, 20th September 1898 1898, Letter from John Stewart & Co, to The Secretary, Lloyd\'s, London, regarding Peri, 19th August 1898 1898, Copy of Letter from pro Secretary, to John Stewart & Co, London, regarding Peri, 20th September 1898 1898, Half Midship Section Plan for Peri, Undated no date )

The listed port to which a given vessel belongs.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

AA1; A & CP ( Iron Ships Report for Peri, 4th January 1869 1869 )

AA1 ( Annual Surveys Report for Peri, 19th April 1870 1870 )

Asterisk AA1 ( Annual Surveys Report for Peri, 28th March 1871 1871, Annual Surveys Report for Peri, 21st December 1875 1875, Survey Report for Peri, 11th January 1878 1878, Annual Surveys Report for Peri, 17th December 1878 1878, Report of Survey for Repairs, &c for Peri, 20th March 1885 1885, Report of Survey for Repairs, &c for Peri, 24th June 1887 1887, Report of Survey for Repairs, &c for Peri, 26th August 1891 1891, Report of Survey for Repairs, &c for Peri, 25th July 1892 1892, Report of Survey for Repairs, &c for Peri, 2nd August 1893 1893, Report of Survey for Repairs, &c for Peri, 15th August 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1895 1895, Report of Survey for Repairs, &c for Peri, 19th September 1896 1896, Report of Survey for Repairs, &c for Peri, 27th October 1897 1897 )

Asterisk AA1; S S no 1-73 ( Report of Survey for Repairs for Peri, 13th May 1873 1873 )

Asterisk AA1; S S no 2-77 ( Report of Survey for Repairs, &c for Peri, 15th January 1877 1877 )

Asterisk AA1; A1 Asterisk 1 ( Report of Survey for Repairs, &c for Peri, 6th December 1888 1888, Report of Survey for Repairs, &c for Peri, 12th November 1889 1889 )

Asterisk AA1; A1x1 black; S S No 1-90; 1st Survey 9,90; ND 90 ( Report of Survey for Repairs, &c for Peri, 30th September 1890 1890 )

Asterisk AA1; SS No 2-94 ( Report of Survey for Repairs, &c for Peri, 12th September 1894 1894 )

Asterisk AA1; S S 2nd No 3-11,98 ( Report of Survey for Repairs, &c for Peri, 15th November 1898 1898 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.