Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Pearl ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

31/07/1885 ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885 )

__/07/1885 ( Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

68 ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885 )

156 ( Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Location where a vessel’s survey was undertaken.

Location of Survey

Paisley ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Profile & Deck Plan for Pearl, 9th February 1885 1885 )

Paisley; Glasgow ( Iron Ship Report for Pearl, 5th September 1885 1885 )

Glasgow ( Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894 )

Bowling; Glasgow ( Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889 )

Tilbury; London ( Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894 )

A vessel’s means of propulsion.

Propulsion

Steam ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

undefined ( Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

05/01/1895 ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; +LMC; A & CP; 1 Dk Iron ( Iron Ship Report for Pearl, 5th September 1885 1885 )

+LMC 9,85 ( Report on Machinery for Pearl, 5th September 1885 1885 )

+100A1 ( Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894 )

+100A1; +LMC 9-85 ( Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887 )

100A1; S S No 1-3/90; +LMC 3/90 ( Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890 )

+LMC 3/90 ( Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890 )

Deferred for Completion ( Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892 )

+LMC 4,92 ( Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892 )

+100A1; 4.92; S S Gls No 190; +LMC 4.92 ( Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893 )

+100A1 4/92; S S Gls No 1/90; +LMC 4/92 ( Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893 )

+LMC 8,93 ( Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894 )

Deferred ( Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894 )

+100A1 8,93 ( Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Direct Acting-Compound-Surface Condensing ( Report on Machinery for Pearl, 5th September 1885 1885 )

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

The year in which a vessel’s construction is completed.

Year of ship completion

1885 ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Fullerton & Co ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Paisley ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

The official record pronounced by the Committee

Loss or disposal

Sunk ( Half Midship Section Plan for Pearl, 10th December 1884 1884, Plan of Section Through Boiler Space for Pearl, 10th December 1884 1884, Iron Ship Report for Pearl, 5th September 1885 1885, Report on Machinery for Pearl, 5th September 1885 1885, Letter from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Pearl, 3rd November 1885 1885, Profile & Deck Plan for Pearl, 9th February 1885 1885, Ship Forgings or Castings Form for Pearl, 8th April 1885 1885, Telegram from Lloyd\'s Surveyors, Glasgow, to the Lloyd\'s Committee, London, regarding Pearl, 13th December 1885 1885, Tests of Boiler Steel for Pearl, 16th February 1885 1885, Tests of Boiler Steel for Pearl, 4th March 1885 1885, Ship Forgings or Castings Form for Pearl, 25th May 1885 1885, Report of Survey for Repairs, &c. for Pearl, 10th February 1886 1886, Report of Survey for Repairs, &c for Pearl, 21st May 1887 1887, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 26th May 1887 1887, Report of Survey for Repairs, &c for Pearl, 26th January 1889 1889, Report of Survey for Repairs, &c for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 27th March 1890 1890, Report of Survey for Repairs, &c for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 21st April 1892 1892, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 3rd June 1892 1892, Report of Survey for Repairs, &c for Pearl, 25th August 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 26th August 1893 1893, Report of Survey for Repairs, &c of Engines & Boilers for Pearl, 17th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 29th December 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Pearl, 13th December 1894 1894, Report of Survey for Repairs, &c for Pearl, 10th December 1894 1894, Report of Total Loss, Casualty, &c for Pearl, 10th January 1895 1895 )

The port in which a vessel is registered or permanently based.

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.