Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Palmas ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
24/07/1888 ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
212 ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Location where a vessel’s survey was undertaken.
Belfast ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, Undated no date )
Glasgow ( Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888 )
Leith ( Engine Forgings Form for Palmas, 7th May 1888 1888 )
Liverpool ( Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889 )
Sunderland ( Ship Forgings Form for Palmas, 19th January 1888 1888 )
London ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
The listed port to which a given vessel belongs.
undefined ( Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Liverpool ( Steel Ship Report for Palmas, 13th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
London ( Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Ship Report for Palmas, 13th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Report on Machinery for Palmas, Undated no date )
Lon ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Evans ( Steel Ship Report for Palmas, 13th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888 )
J Evens ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890 )
Dalgarno ( Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
H L Barclay ( Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
Recorded information related to a vessel’s movements.
Belfast; Liverpool; River Plate ( Steel Ship Report for Palmas, 13th October 1888 1888 )
London; Hamburg; Charlestown ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890 )
London; Rio Janerio ( Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
London; New York ( Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Ship Report for Palmas, 13th October 1888 1888 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion 3 cylinders & 3 cranks ( Report on Machinery for Palmas, 13th October 1888 1888 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1888 ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Report on Machinery for Palmas, Undated no date )
undefined ( Memo requesting return of plans for Palmas, 24th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Test Room Sheet for Palmas, Undated no date )
Is the steamer assisted by sail?
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Proposed Compensation for Hold Beams for Palmas, 10th December 1887 1887, Half Midship Section Plan for Palmas, 3rd December 1887 1887, Plan of Steel Boilers for Palmas, 31st December 1887 1887, Plan of Pumping Arrangement for Palmas, 25th May 1888 1888, Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Memo requesting return of plans for Palmas, 24th October 1888 1888, Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Engine Forgings Form for Palmas, 7th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 7th February 1888 1888, Report for Tests of Boiler Steel for Palmas, 16th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 24th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888, Plan of Donkey Boiler for Palmas, 26th January 1888 1888, Plan of Alterations to Crown Stays for Palmas, 18th April 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, returning plans for Palmas, 25th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, enclosing letter regarding machinery of Palmas, 20th October 1888 1888, Letter from Surveyor George A Milner to the Lloyd's Surveyors, Belfast, regarding safety valve of Palmas, 19th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Form for Particulars for Record of Material of Boilers for Palmas, 17th October 1888 1888, Ship Forgings Form for Palmas, 19th January 1888 1888, Ship Forgings Form for Palmas, 4th July 1888 1888, Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897, Test Room Sheet for Palmas, Undated no date, Report on Machinery for Palmas, Undated no date )
Name of surveyor.
William Sibun ( Ship Forgings or Castings Form for Palmas, 4th May 1888 1888, Report for Tests of Boiler Steel for Palmas, 13th January 1888 1888, Report for Tests of Boiler Steel for Palmas, 28th March 1888 1888, Test Room Sheet for Palmas, Undated no date )
James Turpin ( Letter from Surveyor James Turpin to the Secretary, Lloyd's Register of Shipping, London, enclosing tracings for Palmas, 16th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Palmas, 16th October 1888 1888, Steel Ship Report for Palmas, 13th October 1888 1888 )
William J Darling ( Engine Forgings Form for Palmas, 7th May 1888 1888 )
Charles Edwards ( Report for Tests of Boiler Steel for Palmas, 6th July 1888 1888, Report for Tests of Boiler Steel for Palmas, 25th June 1888 1888 )
Hugh Cameron ( Ship Forgings Form for Palmas, 19th January 1888 1888 )
George Newcomb ( Ship Forgings Form for Palmas, 4th July 1888 1888 )
John F Light ( Letter from John F Light to Secretary Bernard Weymouth Esq, London, requesting forwarding of drawing of Palmas, 19th February 1889 1889, Letter from Secretary & Surveyor John F Light to Bernard Waymouth Esq, returning plan of Palmas, 25th February 1889 1889 )
James H Truscott ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890 )
Edward John Tierney ( Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
The individual and/or organisation listed
Alfred Lewis Jones ( Steel Ship Report for Palmas, 13th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888 )
Elder Dempster & Co ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890, Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
African Steamship Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; 2 Dks (1 Steel) 3 Dk Rule; LA & CP; Cell DB; +LMC 10,88 ( Steel Ship Report for Palmas, 13th October 1888 1888 )
+LMC 10,88 ( Report on Machinery for Palmas, 13th October 1888 1888 )
+100A1 ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890 )
Deferred for No 2 ( Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
Deferred ( Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
The name of the port/place of destination given.
River Plate ( Steel Ship Report for Palmas, 13th October 1888 1888 )
Charlestown ( Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890 )
Rio Janeiro ( Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897 )
New York ( Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2428 ( Steel Ship Report for Palmas, 13th October 1888 1888, Report on Machinery for Palmas, 13th October 1888 1888, Report of Survey for Repairs, &c for Palmas, 11th September 1890 1890 )
2495 ( Report of Survey for Repairs, &c for Palmas, 10th March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Palmas, 4th March 1897 1897 )
Location of construction for a vessel’s engines.
Belfast ( Report on Machinery for Palmas, 13th October 1888 1888 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.