Name of ship as recorded on the record
Myriam ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Oesteloide ( Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950 )
The process of transferring a vessel to water, but not necessarily her completion.
10/11/1920 ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
668 ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
undefined ( Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921 )
Is the steamer assisted by sail?
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921 )
Rio ( Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950 )
The individual and/or organisation listed
The Compagnie Auxiliaire de Navigation ( Steel Steamer Report for Myriam, 12th February 1921 1921 )
Cie Auxiliaire de Navigation ( Report on Machinery for Myriam, 2nd February 1921 1921 )
Lloyd Brasileiro Pat Nav ( Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Pet In Bulk; Lloyds A & Cp; +LMC 2,21; FD; Fitted For Oil Fuel 2,21 FP Above 150 F ( Steel Steamer Report for Myriam, 12th February 1921 1921 )
+LMC 2,21 FD; Fitted For Oil Fuel 2,21 FP Above 150 F ( Report on Machinery for Myriam, 2nd February 1921 1921 )
+LMC; CL 1,45 ( Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950 )
The name of the port/place of destination given.
Port Said ( Steel Steamer Report for Myriam, 12th February 1921 1921 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
Sunderland ( Report on Machinery for Myriam, 2nd February 1921 1921 )
The year in which a vessel’s construction is completed.
1921 ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir James Laing & Sons Ltd ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
The name of the yard where the vessel was built.
Deptford Yard ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Location where a vessel’s survey was undertaken.
Sunderland ( Plan of Boilers for Myriam, 1920 1920, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921 )
Rio de Janeiro ( Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Boilers for Myriam, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Myriam, 15th February 1921 1921, Letter from Assistant to the Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the plans for Myriam, 23rd February 1921 1921, Telegram from Lloyd's Register, Sundelrand to Lloyd's Register, London regarding the plans for Myriam, 23rd February 1921 1921, Letter from T Shaw, for The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the plans for Myriam, 22nd February 1921 1921, Copy of Telegram from Lloyd's Register, London to Lloyd's Register, Sunderland regarding missing plans for Myriam, 22nd February 1921 1921, Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921, Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950, Form for Particulars of Longitudinal Framing for Myriam, Undated no date )
Recorded information relating the specific cargo being conveyed.
The listed port to which a given vessel belongs.
Havre ( Steel Steamer Report for Myriam, 12th February 1921 1921, Report on Machinery for Myriam, 2nd February 1921 1921 )
Rio De Janeiro ( Report of Survey for Repairs, &c for Oesteloide, 3rd January 1950 1950 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Sunderland; Port Said ( Steel Steamer Report for Myriam, 12th February 1921 1921 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Myriam, 12th February 1921 1921 )
Type and configuration of the engine(s) supplied for a vessel.
Triple ( Report on Machinery for Myriam, 2nd February 1921 1921 )
Date in which construction of a vessel’s engines were completed.
1921 ( Report on Machinery for Myriam, 2nd February 1921 1921 )
Have you noticed missing or incorrect data or images for this ship?