Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Newbury ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
21/12/1926 ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
369 ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Location where a vessel’s survey was undertaken.
Greenock ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927 )
Port Glasgow; Greenock ( Steel Steamer Report for Newbury, 27th January 1927 1927 )
London ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927 )
Greenock; Glasgow ( Report on Electric Fittings for Newbury, 2nd February 1927 1927 )
Port Glasgow ( Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927 )
Cardiff ( Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed, Presumed Sunk ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Recorded date for the vessel’s loss or disposal.
15/09/1941 ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
The port in which a vessel is registered or permanently based.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Capper Alexander & Co ( Steel Steamer Report for Newbury, 27th January 1927 1927, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Charles Edward Alexander ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 1,27; Lloyd's A & Cp; +LMC 1,27; FD ( Steel Steamer Report for Newbury, 27th January 1927 1927 )
+LMC 1,27; FD ( Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927 )
See Attached Report ( Report on Boilers for Newbury, 4th January 1927 1927 )
Elec Light ( Report on Electric Fittings for Newbury, 2nd February 1927 1927 )
+100A1; 58,41; BS 10,40 ( Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941 )
BS 10,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941 )
+100A1 10,40; SS No 3-8,39; +LMC 8,39; TS 8,39; CL ( Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KVPM ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927 )
Type and configuration of the engine(s) supplied for a vessel.
Direct Acting Inverted Triple Expansion ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927 )
Triple Expansion ( Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927 )
Date in which construction of a vessel’s engines were completed.
1927 ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941 )
The year in which a vessel’s construction is completed.
1927 ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Duncan & Co Ltd ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
A vessel’s means of propulsion.
Steam ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
undefined ( Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941 )
Is the steamer assisted by sail?
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic ( Request for Special Survey for Newbury, 9th September 1925 1925, Plan of Shafting for Newbury, 18th November 1925 1925, Letter from P R T H, Rankin & Blackmore Ltd, to The Surveyors, Lloyd's Register, Greenock, regarding alterations to the screwed stays for Newbury, 9th May 1925 1925, Plan of Main Boilers for Newbury, 13th February 1925 1925, Copy of a Letter from Capper Alexander & Co, London, to The Secretary, Lloyd's Register, London, regarding Newbury, 29th December 1926 1926, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Newbury, 9th February 1927 1927, Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Half Midship Section Plan for Newbury, 29th January 1927 1927, Profile & Deck Plan for Newbury, 29th January 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Condition & Repairs of Newbury, 19th September 1941 1941, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Newbury, 22nd September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk ( Steel Steamer Report for Newbury, 27th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927 )
Gls ( Report on Electric Fittings for Newbury, 2nd February 1927 1927 )
Cff ( Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941 )
The individual and/or organisation listed
Alexander Shipping Co Ltd ( Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
The Alexander Shipping Co Ltd ( Report on Electric Fittings for Newbury, 2nd February 1927 1927 )
Name of surveyor.
Kenneth Inglis ( Steel Steamer Report for Newbury, 27th January 1927 1927 )
William Gordon Minchin ( Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927 )
J S Rankin ( Report on Electric Fittings for Newbury, 2nd February 1927 1927 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5102 ( Steel Steamer Report for Newbury, 27th January 1927 1927, Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941, Report of Total Loss, Casualty, &c for Newbury, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
FA - Fore & Aft ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927 )
Location of construction for a vessel’s engines.
Greenock ( Form for Vessels of 100 Tons & Upwards for Newbury, 24th January 1927 1927, Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Newbury, 8th September 1941 1941 )
The listed port to which a given vessel belongs.
London ( Report on Steam Reciprocating Engine Machinery for Newbury, 12th January 1927 1927, Report on Boilers for Newbury, 4th January 1927 1927, Report on Electric Fittings for Newbury, 2nd February 1927 1927, Report of Survey for Repairs, &c for Newbury, 9th September 1941 1941 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.