Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1824 ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
The port or place in which the vessel’s construction took place, at the time of writing.
Great Yarmouth ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cff ( Survey report for Nereid, 12 September 1835 1835 )
Lon ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
The listed port to which a given vessel belongs.
Yarmouth/Great Yarmouth ( Survey report for Nereid, 12 September 1835 1835 )
London ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Bonfellow ( Survey report for Nereid, 12 September 1835 1835 )
Watkins ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AE1 ( Survey report for Nereid, 12 September 1835 1835 )
AE1 Asterisk; record recoppered ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
The name of the port/place of destination given.
Constantinople ( Survey report for Nereid, 12 September 1835 1835 )
Smyrna ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Types of timber used throughout a vessel’s construction
Type of timbering specifically utilised for the vessel’s interior.
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Depth of vessel at ship’s side from the highest point of the upper deck to the lowest point of the keel.
The year in which a vessel’s construction is completed.
1824 ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
James Lovewell ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom [England] ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom [England] ( Survey report for Nereid, 12 September 1835 1835 )
The individual and/or organisation listed
John Danby Palmer ( Survey report for Nereid, 12 September 1835 1835 )
J R Watkins & Co ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Location where a vessel’s survey was undertaken.
Cardiff ( Survey report for Nereid, 12 September 1835 1835 )
London ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Recorded information related to a vessel’s movements.
Cardiff; Constantinople ( Survey report for Nereid, 12 September 1835 1835 )
London; Smyrna ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
Wood ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
195 ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Type of timbering specifically utilised for the vessel’s exterior.
EE, BhO ( Survey report for Nereid, 12 September 1835 1835 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Survey report for Nereid, 12 September 1835 1835, Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Measurement from the extreme outboard point of starboard to the extreme outboard point of port.
23.6 1/2 ( Survey report for Nereid, 12 September 1835 1835 )
Name of surveyor.
Nathaniel Middleton ( Report of Survey for Repairs for Nereid, 7th March 1837 1837 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.