Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Nellore ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
05/05/1913 ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Is electric lighting fitted to the vessel?
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk Owing to War Causes ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Recorded date for the vessel’s loss or disposal.
06/07/1944 ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
The listed port to which a given vessel belongs.
Greenock ( Steel Steamer Report for Nellore, 25th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Peninsular & Oriental Steam Navigation Co ( Steel Steamer Report for Nellore, 25th June 1913 1913 )
Isaac Mann Shields ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913 )
Name of surveyor.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 6,13; Lloyds A & CP; +LMC 6,13 FD ( Steel Steamer Report for Nellore, 25th June 1913 1913 )
+LMC 6,13 FD ( Report on Machinery for Nellore, 27th June 1913 1913 )
See minute on accompanying machinery Reports ( Report on Boilers for Nellore, 27th June 1913 1913 )
Elec Light ( Report on Electric Lighting Installation for Nellore, 25th June 1913 1913 )
+100A1 4,44; S S H Kg 2nd No 3-5,38; S S Syd No 1-43; +LMC 9,41; +Lloyds RMC 12,43; B S 4,44; TS(C1) 3,44; S 7,42 ( Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
+100A1 4,44; S S 2nd 3-5,38; S S No 1-43; +LMC 9,41; B S 4,44; +Lloyd's RMC 12,43; TS P S 2,42 3,44 CL ( Report of Total Loss, Casualty, &c for Nellore, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6853 ( Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913 )
6942 ( Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JCMS ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913 )
Type and configuration of the engine(s) supplied for a vessel.
Quadruple Expansion ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913 )
Date in which construction of a vessel’s engines were completed.
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
The year in which a vessel’s construction is completed.
1913 ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
David & Co Ltd ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
A vessel’s means of propulsion.
Steam ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Is the steamer assisted by sail?
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Indian Ocean ( Memo to the Chief Ship Surveyor regarding First Entry Report & Classification of the Nellore, 2nd July 1913 1913, Steel Steamer Report for Nellore, 25th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk ( Steel Steamer Report for Nellore, 25th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913 )
Bom ( Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
The individual and/or organisation listed
Peninsular & Oriental Steam Navigation Co ( Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913 )
Eastern & Australian Steamship Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
Eastern & Australian Steam Ship Co Ltd ( Report of Total Loss, Casualty, &c for Nellore, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J Gaunt ( Steel Steamer Report for Nellore, 25th June 1913 1913 )
John Gaunt ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913 )
Location where a vessel’s survey was undertaken.
Greenock ( Steel Steamer Report for Nellore, 25th June 1913 1913, Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913 )
Bombay ( Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
Physical arrangement of a ship’s masts, sails and rigging.
Unique identifier for a given ship, it is assigned by a builder.
324 ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
The port in which a vessel is registered or permanently based.
Greenock ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913 )
Location of construction for a vessel’s engines.
Greenock ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Machinery for Nellore, 27th June 1913 1913, Report on Boilers for Nellore, 27th June 1913 1913, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944 )
Vessel’s area of loss or disposal/last known recorded location.
Indian Ocean ( Form for Vessels of 100 Tons & Upwards for Nellore, 24th June 1913 1913, Report on Electric Lighting Installation for Nellore, 25th June 1913 1913, Certificate of Survey of Auxilary Boiler & Part Machinery for Nellore, 19th June 1944 1944, Report of Survey for Repairs, &c, of Engines & Boilers for Nellore, 19th June 1944 1944, Report of Total Loss, Casualty, &c for Nellore, Undated no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.