Name of ship as recorded on the record
Narragansett ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
21/01/1936 ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
540 ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
Tanker ( Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Screw Motor Vessel ( Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
A vessel’s calculated maximum speed.
1934 ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934 )
1935 ( Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935 )
y 1935 ( Boiler Plan in German language for Narragansett, 2nd May 1935 1935 )
1936 ( Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936 )
1942 ( Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
ated ( Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
United States Atlantic Coast ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Recorded date for the vessel’s loss or disposal.
25/03/1942 ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The individual and/or organisation listed
Deutsch Amerik Petrol GES ( Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935 )
British Mexican Petroleum Co Ltd ( Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The British Mexican Petroleum Co Ltd ( Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
15000 ( Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935 )
10389 ( Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham ( Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936 )
Glv ( Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Carryg Pet in Bk; Lloyds A & Cp; Mchy Aft Rudder Electrically Welded Longitudinal Framing; +LMC 4,36; Oil Engines CL 3 DB 200 Lbs ( Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936 )
+LMC 4,36; Oil Engines; 3 DB 200 Lbs CL ( Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936 )
See Minute on F E Rpt ( Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936 )
+100Al Carrying Petroleum in Bulk; D B S 3,42; T S 3,42; H & M ( Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942 )
D BS 3,42; TS 3,42 ( Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
+100A1 3,41; SS No 1-41; Carrying Petroleum in Bulk; Oil Engine; +LMC CS 1,41; 1,41; DBS 1,41; TS 1,39 ( Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Frederick John Wolfe ( Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936 )
R A Carder ( Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Location of construction for a vessel’s engines.
Germany ( Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936 )
Kiel ( Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
The listed port to which a given vessel belongs.
The year in which a vessel’s construction is completed.
1936 ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Friedrich Krupp Germaniawerft AG ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Kiel ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
A vessel’s means of propulsion.
undefined ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942 )
Motor (internal combustion) ( Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Is the steamer assisted by sail?
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
United States of America ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934, Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935, Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942, Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
1934 ( Plan in German Language of Crankshaft for Narragansett, 18th June 1934 1934 )
1935 ( Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Plan in German Language of Donkey Boiler for Narragansett, 18th September 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935 )
1936 ( Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Narragansett, 19th May 1936 1936, Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936 )
1942 ( Memo for the Chief Ship Surveyor with their annotations regarding docking of Narragansett, 10th June 1942 1942, Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
0000 ( Report of Total Loss, Casualty, &c for Narragansett, Undated no date )
Location where a vessel’s survey was undertaken.
Kiel Gaarden ( Request for Special Survey of Engines & Boilers of Narragansett, 6th March 1935 1935, Plan in German Language of Half Midship Section for Narragansett, 14th February 1935 1935, Plan in German Language of Profile & Decks for Narragansett, 18th February 1935 1935 )
London ( Boiler Plan in German language for Narragansett, 2nd May 1935 1935, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936 )
Hamburg ( Letter from A Chisholm, Principal Surveyor, Lloyd's Register, Hamburg to the Secretary of Lloyd's Register, regarding payment of fees for Narragansett, 19th May 1936 1936, Certificate of Survey of Donkey Boilers & Machinery for Narragansett, 7th April 1936 1936 )
Kiel; Hamburg ( Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936 )
Galveston Texas ( Report of Survey for Repairs, &c for Narragansett, 25th March 1942 1942, Certificate of Survey of Repairs for Narragansett, 25th March 1942 1942, Certificate of Survey of Donkey Boiler & Part Machinery for Narragansett, 25th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
The port in which a vessel is registered or permanently based.
London ( Steel Steamer or Motorship Report for Narragansett, 25th April 1936 1936, Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Report on Electrical Equipment for Narragansett, 19th April 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
Recorded information relating the specific cargo being conveyed.
Type and configuration of the engine(s) supplied for a vessel.
Internal Combustion Diesel ( Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936 )
Oil Engines 2 S C S A ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Narragansett, 8th May 1936 1936 )
Krupp Type 65/125 EZ ( Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936 )
Date in which construction of a vessel’s engines were completed.
1936 ( Form for Vessels of 100 Tons & Upwards for Narragansett, 30th March 1936 1936, Report on Oil Engine Machinery for Narragansett, 25th April 1936 1936, Report on Boilers for Narragansett, 26th April 1936 1936, Report on Boilers for Narragansett, 25th April 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Narragansett, 25th March 1942 1942 )
Name of surveyor.