Name of ship as recorded on the record
Nalgora ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1921 ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Unique identifier for a given ship, it is assigned by a builder.
946 ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
undefined ( Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940 )
Is the steamer assisted by sail?
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922 )
Hpl ( Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922 )
Hul ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940 )
C.Tn ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940 )
The individual and/or organisation listed
British India Steam Navigation Co Ltd ( Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk Wfbd S 5-3 1/2; Lloyds A & Cp +LMC 7,22 FD CL ( Steel Steamer Report for Nalgora, 22nd July 1922 1922 )
+LMC 7,22; FD CL ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922 )
See Sld Rpt 28377 ( Report on Machinery for Nalgora, 30th May 1922 1922 )
See F E no Sld 28377 ( Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922 )
+100A1; +LMC MS 2,38; B S 9,39; TS CL 10,38; Shelter Deck with freeboard 6,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940 )
+100A1; S S HPL No 1-38; +LMC; B S 9,39; CL 10,38 ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940 )
+100A1 Shelter dk with Freeboard 6,40; SS No 3-10,33; SS No 1-38; +LMC MS 2,28; BS 9,39; TS 10,38CL ( Report of Total Loss, Casualty, &c for Nalgora, Undated no date )
The name of the port/place of destination given.
Tyne ( Steel Steamer Report for Nalgora, 22nd July 1922 1922 )
Location of construction for a vessel’s engines.
West Hartlepool ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940 )
Type and configuration of the engine(s) supplied for a vessel.
Direct Reverse Geared Turbines ( Report on Machinery for Nalgora, 30th May 1922 1922 )
Two Direct Coupled ( Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922 )
The year in which a vessel’s construction is completed.
1922 ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Gray & Co Ltd ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
The Wear Shipyard of William Gray & Co (1918) Ltd ( Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922 )
The name of the yard where the vessel was built.
Wear Shipyard ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Location where a vessel’s survey was undertaken.
West Hartlepool ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922 )
Sunderland ( Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922 )
West Hartlepool; Hartlepool ( Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922 )
Hull ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940 )
Cape Town ( Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Memo regarding confirmation of liner type of screw for Nalgora, 31st May 1922 1922, Letter from R D Shilston, Lloyd's Register of Shipping, West Hartlepool to The Secretary, London, regarding screw shaft liner for Nalgora, 2nd June 1922 1922, Letter from Secretary, Lloyd's Register of Shipping, E.C. 3 to The Surveyors, West Hartlepool, regarding confirmation of screw shaft liner for Nalgora, 1st June 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
Recorded date for the vessel’s loss or disposal.
02/01/1941 ( Plan of Main Boilers for Nalgora, 3rd March 1920 1920, Letter from T S Richard, Lloyd's Register, Sunderland to The Secretary, London, regarding error in report regarding the double bottom tank for Nalgora, 27th July 1922 1922, Memo from the Chief Ship Surveyor to The Classing Committee regarding class of Nalgora, 24th July 1922 1922, Freeboard Verification Form for Steamers for Nalgora, 21st November 1922 1922, Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Half Midship Section Plan for Nalgora, 31st March 1922 1922, Profile & Deck Plans for Nalgora, 31st March 1922 1922, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held for Nalgora, 20th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Remarks from the Chief Engineer Surveyor to The Classing Committee regarding the repairs to the boilers of Nalgora, 13th August 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date, Cover Note for attached Plans of Main Boilers & Arrangement of Gearing for Engine 946 for Nalgora, undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6579 ( Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Certificate of Survey of Boiler for Nalgora, 10th July 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940, Report of Total Loss, Casualty, &c for Nalgora, Undated no date )
6750 ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922 )
The listed port to which a given vessel belongs.
Glasgow ( Steel Steamer Report for Nalgora, 22nd July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c for Nalgora, 21st February 1922 1922, Report on Electric Lighting Installation for Nalgora, 21st July 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
British India Steam Navigation Co Ltd ( Steel Steamer Report for Nalgora, 22nd July 1922 1922 )
Recorded information related to a vessel’s movements.
Sunderland; Tyne ( Steel Steamer Report for Nalgora, 22nd July 1922 1922 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Nalgora, 22nd July 1922 1922 )
Date in which construction of a vessel’s engines were completed.
1922 ( Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 20th July 1922 1922, Report on Machinery for Nalgora, 30th May 1922 1922, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Nalgora, 18th July 1940 1940 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.