Name of ship as recorded on the record
Mount Hebron ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
26/10/1889 ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Unique identifier for a given ship, it is assigned by a builder.
35 ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
A vessel’s means of propulsion.
Steam ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
undefined ( Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889 )
Is the steamer assisted by sail?
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Is machinery fitted at the aft of the vessel?
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; 1DK, Iron; Deep Framing; Well Deck ( Memo regarding Classing for Mount Hebron, 6th December 1889 1889 )
+100A1 Steel; LA&CP; +LMC11,89; 1DK Iron Deep Framing; Well Deck ( Steel Ship Report for Mount Hebron, 26th November 1889 1889 )
+LMC 11,89 ( Report on Machinery for Mount Hebron, 30th November 1889 1889 )
Deferred for Compln of No 1; +LMC 11,93 ( Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894 )
+LMC 11,93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894 )
Deferred ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Ship Report for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889 )
Lon ( Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
The individual and/or organisation listed
Smith & Service ( Steel Ship Report for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Ship Report for Mount Hebron, 26th November 1889 1889 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound (Triple Expansion) ( Report on Machinery for Mount Hebron, 30th November 1889 1889 )
Date in which construction of a vessel’s engines were completed.
The port in which a vessel is registered or permanently based.
Glasgow ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
The name of the port/place of destination given.
Vigo; Cape ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
The year in which a vessel’s construction is completed.
1889 ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
McIlwaine & McColl ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Does the vessel possess an auxiliary power source?
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Is electric lighting fitted to the vessel?
No ( Memo from Henry J Cornish regarding the return of the Report & for the surveyor to state information on the Sheer Strake for Mount Hebron, 3 December 1889 1888, Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Particular for Record of Materials of Boiler for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Memo regarding Classing for Mount Hebron, 6th December 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Ship Forgings Form for Mount Hebron, 26th February 1889 1889, Ship Forgings Form for Mount Hebron, 10th April 1889 1889, Engine Forgings Form for Mount Hebron, 3rd June 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
Location where a vessel’s survey was undertaken.
Belfast ( Plan of Two Steel Boilers for Mount Hebron, 22nd October 1888 1888, Midship Section Plan for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 19th September 1888 1888, Plan of Profile for Mount Hebron, 17th October 1888 1888, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Plan of Donkey Boiler for Mount Hebron, 20th April 1889 1889, Letter to the Secretary, Lloyd's Register of Shipping, London, on the returning of First Entry Report & the approved Midship scketch of Mount Hebron, 5th December 1889 1889, Plan of Masts & Yard for Mount Hebron, 4th March 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Press Copy of a Memo from MacIlwaine & MacColl Ltd, Belfast, regarding fees for Mount Hebron, 29th November 1889 1889, Pumping Plan for Mount Hebron, 18th May 1889 1889 )
Liverpool ( Ship Forgings Form for Mount Hebron, 26th February 1889 1889 )
Glasgow ( Ship Forgings Form for Mount Hebron, 10th April 1889 1889 )
Leith ( Engine Forgings Form for Mount Hebron, 3rd June 1889 1889 )
London ( Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
Name of surveyor.
James Turpin ( Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Steel Ship Report for Mount Hebron, 26th November 1889 1889, Form for Particulars for Record of Moulded Depth in Lloyd's Register for Mount Hebron, 26th November 1889 1889, Memo regarding Certification for Classification, for Mount Hebron, 18th November 1889 1889, Letter from surveyor, James Turpin, to the Lloyds, Secretary, regarding a specific paragraph in the letter, referring to the width of the Sheer strake doubling for Mount Hebron, undated no date )
George Newcomb ( Ship Forgings Form for Mount Hebron, 10th April 1889 1889 )
E J Milton ( Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894 )
George E Wilkinson ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894 )
R Elliott ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
The listed port to which a given vessel belongs.
Glasgow ( Steel Ship Report for Mount Hebron, 26th November 1889 1889, Report on Machinery for Mount Hebron, 30th November 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
E Ellicot ( Steel Ship Report for Mount Hebron, 26th November 1889 1889 )
E Elliott ( Report on Machinery for Mount Hebron, 30th November 1889 1889 )
G Ellicott ( Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894 )
R J Robertson ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2560 ( Steel Ship Report for Mount Hebron, 26th November 1889 1889, Report of Survey for Repairs, &c for Mount Hebron, 15th September 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 30th August 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )
1972 ( Report on Machinery for Mount Hebron, 30th November 1889 1889 )
Location of construction for a vessel’s engines.
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Memo regarding Classing for Mount Hebron, 6th December 1889 1889 )
Recorded information related to a vessel’s movements.
London; Vigo; Cape ( Report of Survey for Repairs, &c, of Engines & Boilers for Mount Hebron, 7th January 1896 1896 )