Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Moskva ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/05/1898 ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

307 ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898 )

Clydebank ( Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897 )

A vessel’s means of propulsion.

Propulsion

Steam ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

undefined ( Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Russian Volunteer Fleet ( Steel Steamer Moskva, 27th August 1898 1898 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100 A1 Steel Water Tube Boilers; La & Cp; +LMC 10,98 ( Steel Steamer Moskva, 27th August 1898 1898 )

+LMC 10,98; Electric Light; Water Tube Boilers ( Report on Machinery for Moskva, 3rd October 1898 1898 )

The name of the port/place of destination given.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1898 ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Clydebank Engineering & Shipbuilding Co Ltd ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Clydebank; Glasgow ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Ship Forgings or Castings Form for Moskva, 17th November 1897 1897, Ship Forgings Form for Moskva, 20th August 1897 1897, Ship Forgings or Castings Form for Moskva, 16th August 1897 1897, Plan of Lower Deck for Moskva, 9th April 1897 1897, Plan of Main Lower & Orlop Decks Shewing Extra Strengthening in Way of Machinery Spaces for Moskva, 23rd March 1897 1897, Longitudinal Section Plan for Moskva, 23rd March 1897 1897, Half Midship section Plan for Moskva, 23rd March 1897 1897, Plan of Arrangement of Boiler Blow Off & Ash Ejector Pump Suction Valves for Moskva, 23rd August 1897 1897, Plan of Forged Steel Rudder for Moskva, 27th April 1897 1897, Plan of Stern Post, Rudder Frame & After Framing for Moskva, 20th April 1897 1897, Upper & Bridge Decks Shewing Strengthening in Way of Machinery Openings Plan for Moskva, 23rd March 1897 1897, Bridge Deck Plan for Moskva, 9th April 1897 1897, Arrangement of Pillaring on Main Deck Plan for Moskva, 10th April 1897 1897, Plan of Rigging for Moskva, 14th May 1897 1897, Plan of Specimen Bulkhead for Moskva, 23rd March 1897 1897, Plan of Details of Flanges for Sea Connections in Boiler Room for Moskva, 23rd August 1897 1897, Plan of Steam Collector for 8 Element Boiler for Moskva, 9th April 1897 1897, Plan of Arrangement of One 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Front Junction Box for Moskva, 9th April 1897 1897, Plan of Feed Collectors for 7 & 8 Element Boilers for Moskva, 9th April 1897 1897, Plan of Donkey Boiler for Moskva, 11th May 1897 1897, Plan of Back Junction Boxes for Moskva, 9th April 1897 1897, Plan of Tubes, Nipples, Coupling & Jam Nuts for Moskva, 9th April 1897 1897, Plan of Arrangement of Tubes for Moskva, 9th April 1897 1897, Plan of Front Junction Box Connecting Tubes & Feed Collector for Moskva, 9th April 1897 1897, Plan of Back Junction Box Lowest Tier for Moskva, 9th April 1897 1897, Steel Steamer Moskva, 27th August 1898 1898, Report on Machinery for Moskva, 3rd October 1898 1898, Report on Electric Lighting Installation for Moskva, 28th September 1898 1898, Form from J C G Williamson, per The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Moskva, 30th August 1898 1898, Form from J C G Williamson, pro Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Certificate of Test of Boilers for Moskva, 4th October 1898 1898, Memo for Moskva, 25th October 1898 1898, Press copy of letter from Glasgow Surveyor James Mollison, regarding Moskva, 17th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 24th October 1898 1898, Letter from James Mollison, to The Secretary, Lloyd\'s Register, London, regarding Moskva, 21st October 1898 1898, Memo for Moskva, 20th October 1898 1898, Plan of Starboard Low Pressure Cylinder for Moskva, 1898 1898, Plan of Method of Filling Cracks for Moskva, 1898 1898 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Glasgow; Odessa ( Steel Steamer Moskva, 27th August 1898 1898 )

Physical arrangement of a ship’s masts, sails and rigging.

Location of construction for a vessel’s engines.

Location of engine build

Glasgow ( Report on Machinery for Moskva, 3rd October 1898 1898 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.