Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Molopo ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
The process of transferring a vessel to water, but not necessarily her completion.
07/12/1899 ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900 )
1899/12/07 ( Steel Steamer Report for Molopo, 24th January 1900 24 )
Unique identifier for a given ship, it is assigned by a builder.
465 ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Location where a vessel’s survey was undertaken.
Hull ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Report on Machinery for Molopo, 17th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
The individual and/or organisation listed
T Hamling & Co Ltd ( Report on Machinery for Molopo, 17th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Thomas Hamling & Co Ltd ( Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 1, 00 ( Report on Machinery for Molopo, 17th January 1900 1900 )
+100A1; Steam Trawler ( Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900 )
+100A1 (Steel); Steam Trawler; LA & CP; +LMC 1, 00 ( Steel Steamer Report for Molopo, 24th January 1900 24 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound ( Report on Machinery for Molopo, 17th January 1900 1900 )
Triple Three Crank Direct Acting Inverted Vertical ( Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900 )
Date in which construction of a vessel’s engines were completed.
The name of the port/place of destination given.
Physical arrangement of a ship’s masts, sails and rigging.
The year in which a vessel’s construction is completed.
1899 ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Earles Shipbuilding & Engineering Co Ltd ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
The port or place in which the vessel’s construction took place, at the time of writing.
Hull ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
A vessel’s means of propulsion.
Steam ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Molopo, 27th May 1899 1899, Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Report on Machinery for Molopo, 17th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Profile showing alteration to dept of floors for boiler room & centre Keelson for Molopo, 10th July 1899 1899, Plan of Proposed Arrangement of Rudder & Sternpost for Molopo, 28th June 1899 1899, Plan of Steel Boiler for Molopo, 17th June 1899 1899, Form from W Rowell to the Secretary of Lloyd's Register forwarding Midship Section for Molopo, 24th January 1900 1900, Remarks of the Chief Surveyor to the Classing Committee, regarding Class of Molopo, 27th January 1900 1900, Letter from W Rowell, to the Secretary of Lloyd's Register, London, regarding First Entry Machinery Report for Molopo, 31st January 1900 1900, Memo to The surveyor requesting the length of the stern of Molopo, 27th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
The listed port to which a given vessel belongs.
Name of surveyor.
William C Hamilton ( Report on Machinery for Molopo, 17th January 1900 1900 )
Thomas Robertson ( Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900 )
Joseph Thomson ( Steel Steamer Report for Molopo, 24th January 1900 24 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
220 ( Report on Machinery for Molopo, 17th January 1900 1900, Report of Survey for Repairs, &c, of Engines & Boilers for Molopo, 20th June 1900 1900, Report of Survey for Repairs, &c for Molopo, 20th June 1900 1900, Steel Steamer Report for Molopo, 24th January 1900 24 )
224 ( Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900 )
Location of construction for a vessel’s engines.
Recorded information related to a vessel’s movements.
The port in which a vessel is registered or permanently based.
Hull ( Form for Vessels of 100 Tons & Upwards for Molopo, 2th January 1900 1900 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Irish ( Steel Steamer Report for Molopo, 24th January 1900 24 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.