Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Minerve ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date )
Donner Lake ( Thicknesses of Plating form for Donner Lake, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1944 ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
66 ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Location where a vessel’s survey was undertaken.
Portland Oregon ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943 )
New York ( Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948 )
Seattle Washington ( Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948 )
Los Angeles Harbor California ( Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948 )
Los Angeles ( Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948 )
Seattle; New York ( Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948 )
A vessel’s means of propulsion.
Steam ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date )
undefined ( Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Thicknesses of Plating form for Donner Lake, Undated no date )
Is the steamer assisted by sail?
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up, Demolition Commenced ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
Spain ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948 )
The port in which a vessel is registered or permanently based.
Le Havre ( Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 2,48 SEA; Carrying Petroleum in Bulk; Fitted for Oil Fuel FP Above 150 F; 2,48 SS Sea 2,48; LMC 2,48; TS 12,47 ( Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948 )
See First Entry Rpt Sea 3729 ( Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948 )
LMC 2,48; TS 12,47 ( Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948 )
LMC 2,48 ( Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948 )
See Attached First Entry Report ( Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948 )
2 WTB (Spt) 500 Lbs ( Report on Water Tube Boilers for Minerve, 20th February 1948 1948 )
Elec Light ( Report on Electrical Equipment for Minerve, 20th February 1948 1948 )
+100A1; Carrying Petroleum in Bulk ( Report of Surveys for Freeboard for Minerve, January 1948 1948 )
+100A1; Oil Tanker 1,60; SS Dr 9,56; Classed 2,48; Storage Ship class Suspended 1,61; LMC CS 9,56; BS M 1,60; SP 9,56; TS 1,60 CL ( Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date )
The listed port to which a given vessel belongs.
Le Havre ( Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948 )
Recorded information related to a vessel’s movements.
Seattle Wash; San Francisco; San Pedro; California ( Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Jean Demeret ( Copy of Certificate of Examination for Minerve, 22nd March 1948 1948 )
Date in which construction of a vessel’s engines were completed.
1944 ( Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948 )
The year in which a vessel’s construction is completed.
1944 ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Kaiser Co Inc ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Portland, Oregon ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Tanker ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date )
undefined ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Thicknesses of Plating form for Donner Lake, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Is electric lighting fitted to the vessel?
No ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
The official record pronounced by the Committee
Broken up ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Castellon ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Recorded date for the vessel’s loss or disposal.
07/04/1964 ( Capacity Plan for Minerve, 17th December 1923 1923, Half Midship Section Plan for Minerve, 23rd December 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS for Classification Alterations & Repairs for Minerve, 7th May 1948 1948, Letter from Principal Surveyor, to J F Robertson Esq, Seattle, regarding Minerve, 9th April 1948 1948, Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Minerve, 11th May 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948, Report of Surveys for Freeboard - Conditions of Assignment for Minerve, January 1948 1948, Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date, Thicknesses of Plating form for Donner Lake, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sea ( Steel Steamer Report for Minerve, 10th February 1948 1948, Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948 )
L.An ( Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948 )
The individual and/or organisation listed
French Government ( Steel Steamer Report for Minerve, 10th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948 )
Government of France ( Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
10449 ( Steel Steamer Report for Minerve, 10th February 1948 1948 )
10448 ( Report of Survey for Repairs, &c for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948, Copy of Certificate of Survey of Repairs for Minerve, 20th February 1948 1948, Copy of Certificate of Survey of Boilers & Machinery for Minerve, 20th February 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948, Report on Electrical Equipment for Minerve, 20th February 1948 1948, Report of Surveys for Freeboard for Minerve, January 1948 1948 )
10702 ( Report of Total Loss, Casualty, Breaking Up, etc for Minerve, Undated no date )
The name of the port/place from which a vessel’s voyage originated.
The name of the port/place of destination given.
San Francisco; San Pedro; California ( Copy of Certificate of Survey of Boilers & Machinery for Minerve, 8th March 1948 1948, Copy of Certificate of Examination for Minerve, 22nd March 1948 1948 )
Location of construction for a vessel’s engines.
Lynn Mass ( Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 23rd March 1948 1948, Report of Survey for Repairs, &c, of Engines & Boilers for Minerve, 20th February 1948 1948, Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948, Report on Water Tube Boilers for Minerve, 20th February 1948 1948 )
Type and configuration of the engine(s) supplied for a vessel.
One Curtis Impulse 10 Stage Turbine ( Report on Steam Turbine Machinery for Minerve, 20th February 1948 1948 )
1 Curtis Impulse 10 Stage Turbine ( Report on Electric Propelling Machinery for Minerve, 20th February 1948 1948 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.