Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Marlay ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The process of transferring a vessel to water, but not necessarily her completion.
20/05/1890 ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Unique identifier for a given ship, it is assigned by a builder.
70 ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Location where a vessel’s survey was undertaken.
Belfast ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890 )
Liverpool ( Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890 )
Troon; Glasgow ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Glasgow ( Report of Survey for Repairs &c for Marlay, 25th October 1894 1894 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Does the vessel possess an auxiliary power source?
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Is electric lighting fitted to the vessel?
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Ship Report for Marlay, 28th August 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890 )
Gls ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The individual and/or organisation listed
R Ledcastle & Co ( Steel Ship Report for Marlay, 28th August 1890 1890 )
R Tedcastle & Co ( Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895 )
R Tidcastle & Co ( Report of Survey for Repairs &c for Marlay, 25th October 1894 1894 )
R Seacastle & Co ( Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894 )
R Redcastle & Co ( Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895 )
R Sedcastle & Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897 )
Tedcastle McFormick & Co Ltd ( Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898 )
Tedcastle McCorkmick & Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898 )
Tedcastle McCormick & Co Ltd ( Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 Steel; +Lmc 9/90 1Dk son & Web frames; La & Cp Well Dk ( Steel Ship Report for Marlay, 28th August 1890 1890 )
+LMC 9/90 ( Report on Machinery for Marlay, 3rd September 1890 1890 )
+100A1 ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897 )
+LMC 10,94 ( Report of Survey for Repairs &c for Marlay, 25th October 1894 1894 )
+LMC 10,94; Subject ( Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894 )
Deferred for Compln of Eapt ( Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895 )
+100A1; 4,95, on Gls No 13571 ( Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895 )
+100A1 4/95; S S No1-94; +LMC 10/94; but without limit ( Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895 )
+100A1 10-96; S S Trn No 1-94; +LMC 10-94; B S 10,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897 )
100 A1 ( Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898 )
S S4, 98 ( Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898 )
Withdraw Class & Insert three dots ( Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899 )
Deferred ( Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The name of the port/place of destination given.
Channel ( Steel Ship Report for Marlay, 28th August 1890 1890 )
Coasting ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Dublin ( Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
998 ( Steel Ship Report for Marlay, 28th August 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890 )
798 ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Location of construction for a vessel’s engines.
Belfast ( Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Name of surveyor.
Joseph Thomson ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893 )
A Campbell Holms ( Report of Survey for Repairs &c for Marlay, 25th October 1894 1894 )
James L Sinnette ( Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898 )
James Mollison ( Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895 )
A McKeand ( Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The year in which a vessel’s construction is completed.
1890 ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
A vessel’s means of propulsion.
Steam ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Boiler for Marlay, 1889 1889, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
undefined ( Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890 )
Sail ( Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895 )
Is the steamer assisted by sail?
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Is machinery fitted at the aft of the vessel?
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan for Boiler Shewing Proposed Hold Stringer for Marlay, 19th April 1889 1889, Plan of Longitudinal Section & Main & Quarter Deck Plans for Marlay, 1889 1889, Plan of Alternative Method of Fitting Double Bottom for Marlay, 1889 1889, Half Midship Section Plan for Marlay, 20th April 1889 1889, Plan of Boiler for Marlay, 1889 1889, Letter from Surveyor James Maxton to the Secretary, Lloyd's Register, London, forwarding Midship Section of Marlay, 29th August 1890 1890, Engine Forgings or Castings Form for Marlay, 3rd January 1890 1890, Engine Forgings Form for Marlay, 22nd August 1890 1890, Particulars for Record of Moulded Depth Form for Marlay, 5th September 1890 1890, Plan of Longitudinal Section & Main & Quarter Deck Plan for Marlay, 5th September 1890 1890, Plan of Arrangement of Portable Beams & Fore & afters in Hatches for Marlay, 7th March 1890 1890, Plan of Pumping Arrangement for Marlay 9th May 1890 1890, Letter from Surveyor James Maxton to William Johnston Esq, regarding side plating of Marlay, 8th September 1890 1890, Steel Ship Report for Marlay, 28th August 1890 1890, Particulars for Record of Double Bottoms &c, for Marlay, 5th September 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
The listed port to which a given vessel belongs.
Dublin ( Steel Ship Report for Marlay, 28th August 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 13th September 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Straney ( Steel Ship Report for Marlay, 28th August 1890 1890, Report on Machinery for Marlay, 3rd September 1890 1890 )
A Irving ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893, Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893 )
S Walton ( Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895 )
S Welton ( Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894 )
S Waltour ( Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895 )
John Gill ( Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897 )
J Gill ( Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899 )
Recorded information related to a vessel’s movements.
Belfast; Channel ( Steel Ship Report for Marlay, 28th August 1890 1890 )
Glasgow; Coasting ( Report of Survey for Repairs, &c for Marlay, 7th March 1893 1893 )
Troon; Coasting ( Report of Survey for Repairs, &c for Marlay, 13th September 1893 1893, Report of Survey for Repairs &c for Marlay, 25th October 1894 1894, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c for Marlay, 2nd April 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c for Marlay, 18th April 1899 1899, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Troon; Dublin ( Report of Survey for Repairs, & C for Marlay, 3rd April 1895 1895, Report of Survey for Repairs, &c for Marlay, 8th June 1895 1895, Report of Survey for Repairs, &c for Marlay, 2nd April 1897 1897 )
Physical arrangement of a ship’s masts, sails and rigging.
Type and configuration of the engine(s) supplied for a vessel.
Compound DASC 2 cyl & 2 cranks ( Report on Machinery for Marlay, 3rd September 1890 1890 )
Date in which construction of a vessel’s engines were completed.
1890 ( Report on Machinery for Marlay, 3rd September 1890 1890, Report of Survey for Repairs &c of Engines & Boilers for Marlay, 24th October 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 2nd April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Marlay, 5th April 1898 1898, Report of Survey for Repairs, &c., of Engines & Boilers for Marlay, 12th April 1899 1899 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.