Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Hyson ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
Maria Rosa ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
The process of transferring a vessel to water, but not necessarily her completion.
05/10/1899 ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
25/06/1892 ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Unique identifier for a given ship, it is assigned by a builder.
411 ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
261 ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Ship Casting Form for Hyson, 3rd October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
Partick Glasgow ( Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Plan of Rudder for Hyson, 17th January 1899 1899 )
71 Fenchurch Street, London ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931 )
Port of Genoa (111), Piazza Cavour 35 ( Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932 )
Genoa ( Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
71 Fenchurch Street, London; Genoa ( Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932 )
A vessel’s means of propulsion.
Steam ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Is the steamer assisted by sail?
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Is machinery fitted at the aft of the vessel?
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Glasgow; China; Japan ( Iron or Steel Steamer for Hyson, 6th December 1899 1899 )
Genoa Harbour ( Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Genoa ( Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Iron or Steel Steamer for Hyson, 6th December 1899 1899 )
Name of surveyor.
George Murdoch ( Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
Frank Cook ( Ship Forgings Form for Hyson, 15th March 1899 1899 )
James Simon Ormiston ( Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932 )
Norman George Turnbull ( Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932 )
Arthur Benjamin Roberts Harris ( Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931 )
George Clark Vaux ( Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Location of construction for a vessel’s engines.
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
5950 ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
626 ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
53.2 ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
The name of the port/place from which a vessel’s voyage originated.
The year in which a vessel’s construction is completed.
1899 ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
1892 ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
D & W Henderson ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
T Royden & Sons ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
Liverpool ( Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Does the vessel possess an auxiliary power source?
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Is electric lighting fitted to the vessel?
No ( Ship Casting Form for Hyson, 3rd October 1898 1898, Half Midship Section Plan for Hyson, 30th March 1898 1898, Half Midship Section Plan for Hyson, 4th March 1898 1898, Profile Plan for Hyson, 27th October 1898 1898, Profile Plan for Hyson, 16th November 1898 1898, Plan of Stern Frame for Hyson, 5th July 1898 1898, Piping Plan for Hyson, 11th November 1898 1898, Plan of Deep Tanks for Hyson, 27th October 1898 1898, Plan of Main Boiler for Hyson, 29th March 1898 1898, Plan of Winch Boiler for Hyson, 27th September 1898 1898, Steel Decks Plan for Hyson, 27th October 1898 1898, Iron or Steel Steamer for Hyson, 6th December 1899 1899, Fragment of Report on Machinery for Hyson, 5th November 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899, Engine Forgings Form for Hyson, 16th November 1899 1899, Ship Forgings Form for Hyson, 16th August 1899 1899, Ship Forgings Form for Hyson, 15th March 1899 1899, Form from pro The Surveyors, to The Secretary, Lloyd\'s Register, London, Forwarding Midship Section for Hyson, 1st December 1899 1899, Plan of Rudder for Hyson, 17th January 1899 1899, Report on Electric Lighting Installation for Hyson, January 1900 1900, Copy of Correspondence from the pro Secretary to the surveyors at Genoa regarding Maria Rosa, 2 October 1931 1931, Correspondence from James S ormiston, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding Maria Rosa, 28 September 1931 1931, Correspondence from Emanuele Bozzo and Luigi Mortola to the Secretary of Lloyds Register London regarding the the third special survey no 1 on Maria Rosa, 28 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to the surveyors at Genoa regarding Maria Rosa, 21 September 1931 1931, Copy of Correspondence from the pro Secretary of Lloyds Register London to E Booz & L Mortola regarding surveys on Maria Rosa, 25 August 1931 1931, Copy of Correspondence from the Secretary to the Principal Clerk of Lloyd's regarding the classification of vessels laid up including Cassis, Gronsund, Maria Rosa, Wulsty Castle, Cymric Pride, Istar, 25 August 1931 1931, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 20 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Maria Rosa, 14 August 1931 1931, Correspondence between Lloyds Register London and N G Turnbull, Lloyds Register surveyor at Genoa regarding Genoa, 28 July 1931 1931, Correspondence from A B R Harris to the Secretary in London regarding Maria Rosa and circular No 963, 2 June 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee for Maria Rosa, 21 May 1931 1931, Copy of document certifying that surveyor has examined part of the boiler of Maria Rosa and transmitted the Report, and stating his Recommendations 1931, Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Copy of Classing Letter written to Henoa, 27 March 1931 1931, Remarks to the Chief Engineer Surveyor regarding Boiler Survey for Maria Rosa, 25 March 1931 1931, Correspondence from Lloyds Register Genoa to the Secretary of Lloyds Register London regarding boiler survey on Maria Rosa, 20 March 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Copy of Correspondence from the pro Secretary to the Prinicipal Clerk of Lloyds regarding the classification of vessels laid up including Maria Rosa and Maroulio V. Polemi, 14 June 1932 1932, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932, Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Maria Rosa, 6 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932, Translation of Telegram from the surveyor at Genoa regarding Maria Rosa, 4 June 1932 1932, Telegram regarding Maria Rosa, 3 June 1932 1932, Translation of cablegram regarding Maria Rosa, 3 June 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 25 April 1932 1932, Correspondence between Lloyds Register London and James S Ormiston, Lloyds Register surveyor at Genoa regarding the status of Maria Rosa, 5 January 1932 1932, Telegram regarding Maria Rosa no date, Translation of letter from 4 March 1931 regarding Maria Rosa no date, Translation of letter from 30 January 1931 regarding Maria Rosa no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
China Mutual Str nav Co ( Iron or Steel Steamer for Hyson, 6th December 1899 1899 )
The China Mutual S Nav Co Ltd ( Report on Machinery for Hyson, 29th November 1899 1899 )
China Mutual Steam Navigation Co Ltd ( Report on Electric Lighting Installation for Hyson, January 1900 1900 )
E Bozzo; L Mortola ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932 )
Edoardo Sturlese & Co ( Correspondence from N G Turnbull to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 8 June 1932 1932, Correspodnence from N G Turnbull, Lloyds Register surveyor at Genoa to the Secretary of Lloyds Register London regarding the sale and breaking up of Maria Rosa, 3 June 1932. Document has "case requiring early attention attached. 1932 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; +LMC 11,99 La & CP ( Iron or Steel Steamer for Hyson, 6th December 1899 1899 )
+LMC 11,99 ( Report on Machinery for Hyson, 29th November 1899 1899 )
Deferred for No 1 & c ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
+100A1 12.29 ( Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932 )
The name of the port/place of destination given.
China & Japan ( Iron or Steel Steamer for Hyson, 6th December 1899 1899 )
Cardiff ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6608 ( Iron or Steel Steamer for Hyson, 6th December 1899 1899, Report on Machinery for Hyson, 29th November 1899 1899 )
6583 ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931, Registro Italiano Report on Machinery for Maria Rosa, 30 January 1931 1931, Report of Total Loss and Casualty for Maria Rosa, 13 June 1932 1932 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Hyson, 29th November 1899 1899 )
Single Cylinder Engine Coupled Direct to Compound Wound Dynames ( Report on Electric Lighting Installation for Hyson, January 1900 1900 )
Triple Expansion 3 Cylinders ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Date in which construction of a vessel’s engines were completed.
1899 ( Report on Machinery for Hyson, 29th November 1899 1899 )
1899/11/__ ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
450 ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
31.1 ( Report of Survey for Repairs of Engines and Boilers for Maria Rosa, 13 May 1931 1931 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.