Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Marchioness of Londonderry ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
The process of transferring a vessel to water, but not necessarily her completion.
03/01/1878 ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Unique identifier for a given ship, it is assigned by a builder.
71 ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Broad categories and subdivisions of vessels related to their purpose or function.
Predominant material(s) utilised in a vessel’s construction.
Iron ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
The individual and/or organisation listed
Marquis of Londonderry ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880 )
The Marquis of Londonderry ( Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878 )
Marguise of Londondery ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879 )
Marguis of Londonderry ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Name of surveyor.
Samuel P Gladstone ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880 )
James Bain ( Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878 )
James Williamson ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879 )
Frederick W Bonniwell ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880 )
Christopher Besant ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880 )
Duncan Ritchie ( Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880 )
James Sibun ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
90A1; A & Cp; Iron Dk Dbl bot 90ft ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878 )
90A1 ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880 )
90A1; 3,80; Lloyds MC 1,78 ( Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
706 ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Location of construction for a vessel’s engines.
Hartlepool ( Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878 )
Recorded information related to a vessel’s movements.
Sunderland; Coasting ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Middlesbrough; Tyne ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880 )
Sunderland; London ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880 )
Hartlepool; Coasting ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880 )
The year in which a vessel’s construction is completed.
1878 ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Edward Withy & Co ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
The port or place in which the vessel’s construction took place, at the time of writing.
Hartlepool ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Is the steamer assisted by sail?
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Marchioness of Londonderry, 1877 1877, Profile & Deck Plan for Marchioness of Londonderry, 1877 1877, Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
The listed port to which a given vessel belongs.
Sunderland ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Thompson ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Millar ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879 )
Thomson ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880 )
Location where a vessel’s survey was undertaken.
Hartlepool ( Iron Ship Report for Marchioness of Londonderry, 13th February 1878 1878, Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs of Engines & Boilers for Marchioness of Londonderry, 16th April 1880 1880 )
West Hartlepool ( Details of Main Boilers of the Steam Ship for Marchioness of Londonderry, 6th February 1878 1878 )
Sunderland ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Middlesbrough ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880 )
Physical arrangement of a ship’s masts, sails and rigging.
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Surface Condensing ( Engineer Surveyor's Report on Machinery for Marchioness of Londonderry, 31st January 1878 1878 )
Date in which construction of a vessel’s engines were completed.
The name of the port/place of destination given.
Coasting ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th November 1879 1879, Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th April 1880 1880, Report of Survey for Repairs, &c for Marchioness of Londonderry, 23rd April 1880 1880 )
Tyne ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 16th January 1880 1880 )
London ( Report of Survey for Repairs, &c for Marchioness of Londonderry, 8th March 1880 1880 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.