Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The port or place in which the vessel’s construction took place, at the time of writing.
Lussino ( Plan of Midship Section for Maratona, 1876 1876, Survey Report for Maratona, 31st July 1876 1876 )
Lussinpiccolo ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Predominant material(s) utilised in a vessel’s construction.
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Midship Section for Maratona, 1876 1876, Survey Report for Maratona, 31st July 1876 1876, Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Tri ( Survey Report for Maratona, 31st July 1876 1876 )
Lon ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
The individual and/or organisation listed
N Martinolich & Co ( Survey Report for Maratona, 31st July 1876 1876 )
Martinolich ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Name of surveyor.
Elias Florio ( Survey Report for Maratona, 31st July 1876 1876 )
Thomas Congdon ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 10 Yrs; A & CP; 9 & 12 Yrs Mat ( Survey Report for Maratona, 31st July 1876 1876 )
10A1; SS 81; YM 81 ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
The name of the port/place of destination given.
Atlantic ( Survey Report for Maratona, 31st July 1876 1876 )
Natal ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
258 ( Survey Report for Maratona, 31st July 1876 1876, Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
The year in which a vessel’s construction is completed.
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A vessel’s means of propulsion.
Is the steamer assisted by sail?
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The listed port to which a given vessel belongs.
Lussino ( Survey Report for Maratona, 31st July 1876 1876, Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
Lussino; Trieste ( Survey Report for Maratona, 31st July 1876 1876 )
London ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Recorded information related to a vessel’s movements.
Lussino; Trieste; Mediterranean; Atlantic ( Survey Report for Maratona, 31st July 1876 1876 )
London; Natal ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Physical arrangement of a ship’s masts, sails and rigging.
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Report of Survey for Repairs, &c for Maratona, 29th July 1881 1881 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.