Manx Admiral ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
22/11/1911 ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
512 ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Location where a vessel’s survey was undertaken.
Selby ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911 )
Selby; Hull ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912 )
Grimsby ( Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926 )
London ( Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
A vessel’s means of propulsion.
Steam ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926 )
undefined ( Report on Machinery for Manx Admiral, 24th January 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
1911 ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911 )
1912 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912 )
1925 ( Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925 )
1926 ( Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926 )
0000 ( Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J W Ashley ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912 )
John William Ashley ( Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Stm Trawler; Lloyds A & CP; +LMC 1,12 ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912 )
+LMC 1,12 ( Report on Machinery for Manx Admiral, 24th January 1912 1912 )
Withdraw Class & Insert (. . .) ( Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The name of the port/place of destination given.
Fishing ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
219 ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Inverted Cylinder ( Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912 )
Triple Expansion ( Report on Machinery for Manx Admiral, 24th January 1912 1912 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1912 ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Sons ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Selby ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Trawler ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926 )
undefined ( Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Report on Machinery for Manx Admiral, 24th January 1912 1912, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925, Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
A vessel’s calculated maximum speed.
1911 ( Half Midship Section Plan for Manx Admiral, 24th July 1911 1911, Profile & Deck Plan for Manx Admiral, 24th July 1911 1911 )
1912 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Manx Admiral, 6th February 1912 1912, Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912 )
1925 ( Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 25th September 1925 1925, Copy of Letter from Assistant to the Secretary, to The Surveyors, Grimsby, regarding Manx Admiral, 24th September 1925 1925 )
1926 ( Copy of Letter from Assistant to the Secretary, to Beeley & Sleight Ltd, Grimsby, regarding Manx Admiral, 4th February 1926 1926, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Copy of Letter from W G McKinlay, for The Surveyors, to The Secretary, London, regarding Manx Admiral, 22nd January 1926 1926 )
ated ( Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912 )
Lon ( Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The individual and/or organisation listed
Walter Harold Buley ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912 )
Walter Harold Beeley ( Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912 )
Beeley & Sleight Ltd ( Memo regarding Classification for Manx Admiral, 4th February 1926 1926 )
Sleights Steam Fishing Co Ltd ( Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
Name of surveyor.
Allison B Wilson ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912 )
Recorded information related to a vessel’s movements.
Selby; Fishing ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912 )
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Steel Steamer Report for Manx Admiral, 3rd February 1912 1912, Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912, Memo regarding Classification for Manx Admiral, 4th February 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Boiler for Manx Admiral, 27th January 1926 1926, Report of Survey for Repairs, &c for Manx Admiral, Undated no date )
The port in which a vessel is registered or permanently based.
Grimsby ( Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912 )
Location of construction for a vessel’s engines.
Hull ( Form for Vessels of 100 Tons & Upwards for Manx Admiral, 18th January 1912 1912, Report on Machinery for Manx Admiral, 24th January 1912 1912 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Beeley & Sleight ( Report of Survey for Repairs, &c for Manx Admiral, Undated no date )