Name of ship as recorded on the record
Mangal ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Main Deck Plan for Mangal, Undated no date )
Karatoya ( Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Report of Survey for Repairs, &c for Karatoya, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
16/03/1951 ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
158 ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Barge ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Certificate of Class for Karatoya, 23rd January 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Memo for Karatoya, 21st April 1954 1954, Report of Survey for Repairs, &c for Karatoya, Undated no date )
undefined ( Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Main Deck Plan for Mangal, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
The individual and/or organisation listed
India General Railway & Navigation Co Ltd ( Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949 )
India General Nav Railway Co Ltd ( Steel Barge Report for Mangal, 20th March 1951 1951 )
India General Navigation & Railway Co Ltd ( Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Barge Report for Mangal, 20th March 1951 1951 )
Cal ( Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953 )
Lon ( Report of Survey for Repairs, &c for Karatoya, Undated no date )
The listed port to which a given vessel belongs.
London ( Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, Undated no date )
The port in which a vessel is registered or permanently based.
London ( Certificate of Class for Karatoya, 23rd January 1953 1953 )
The year in which a vessel’s construction is completed.
1951 ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Clelands (Successors) Ltd ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Wallsend on Tyne ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
undefined ( Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949 )
Non-propelled ( Steel Barge Report for Mangal, 20th March 1951 1951 )
Is the steamer assisted by sail?
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of General Arrangement & Structural Details for Mangal, July 1949 1949, Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949, Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951, Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Mangal, 17th April 1951 1951, Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Karatoya, 16th November 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Memo for Karatoya, 21st April 1954 1954, Main Deck Plan for Mangal, Undated no date, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Location where a vessel’s survey was undertaken.
Newcastle on Tyne ( Request for Special Survey of Boilers & Engines for Mangal, 5th September 1949 1949 )
Wallsend ( Plan of Shell & Framing Expansion for Mangal, 12th March 1951 1951 )
London ( Copy of Letter from Pro Secretary of Lloyd\'s Register to the Surveyors, Lloyd\'s Register, Calcutta, regarding Karatoya, 19th April 1951 1951, Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The India General Navigation & Railway Co Ltd, London, regarding Karatoya, 4th August 1954 1954, Copy of Letter received from India General Navigation & Railway Co Ltd, London, regarding Karatoya, 23rd July 1954 1954, Report of Survey for Repairs, &c for Karatoya, Undated no date )
Wallsend-on-Tyne; Newcastle-on-Tyne ( Steel Barge Report for Mangal, 20th March 1951 1951 )
Calcutta ( Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953 )
Sonachara Pakistan; Calcutta ( Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952 )
Wallsend Northumberland ( Main Deck Plan for Mangal, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See minute on Cal 15372 ( Steel Barge Report for Mangal, 20th March 1951 1951, Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952 )
+100A1 Barge; 10,52 Cal; Lloyd\'s A & CP; For Coastal Service between Chittagong & Dacca; Cargo-battens not fitted ( Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952 )
+100A1 Barge for Coastal Service between Chittagong & Dacca ( Certificate of Class for Karatoya, 23rd January 1953 1953 )
9,53 Cal ( Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953 )
Withdraw Class & insert (…) ( Report of Survey for Repairs, &c for Karatoya, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
546 ( Report of Survey for Repairs, &c for Karatoya, 29th October 1952 1952, Report of Survey for Repairs, &c for Karatoya, 9th December 1952 1952 )
564 ( Certificate of Class for Karatoya, 23rd January 1953 1953, Copy of Certificate of Survey of Repairs for Karatoya, 29th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, 25th September 1953 1953, Report of Survey for Repairs, &c for Karatoya, Undated no date )