Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Lyonnesse ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

02/02/1889 ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

45 ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

The listed port to which a given vessel belongs.

Port belonging to

undefined ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Penzance ( Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889 )

A vessel’s means of propulsion.

Propulsion

undefined ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Steam ( Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1889 ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harvey & Co Ltd ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hayle ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Cornwall ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888 )

Glasgow ( Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888 )

Liverpool ( Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888 )

Falmouth ( Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Hayle; Falmouth ( Steel Ship Report for Lyonnesse, 27th April 1889 1889 )

Hayle; Liverpool; Falmouth ( Report on Machinery for Lyonnesse, 16th April 1889 1889 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Letter from F H Harvey for Harve & Co Ltd, to surveyor, T H Sandry Esq Falmouth,submitting documentation for approval for Lyonnesse, 2nd November 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 3rd October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Plates & Plates segments, for Lyonnesse, 1st October 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for a Boiler Plate for Lyonnesse, 19th September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by W Roberts, for Lyonnesse, 22nd September 1888 1888, Receipt with specifications for order from The Steel Co of Scotland, signed & dated by Lloyds Surveyor, Glasgow for Lyonnesse, 24th October 1888 1888, Form for Tests of Boiler Steel for Lyonnesse, 22nd September 1888 1888, Engine Forgings or Castings Form for Lyonnesse, 11th April 1889 1889, Freeboard of Steam Ship Form for Lyonnesse, 6th May 1889 1889, Telegram from surveyor T H Sandry to the Committee, regarding an unmarked Freeboard, for Lyonnesse, 29th April 1889 1889, Letter from surveyor, T H Sandry to the Lloyds Register, Secretary, London, informing of the reception of the letter, enclosing First Entry Report for Lyonnesse, 3rd May 1889 1889, Form of Particulars for Record of Double Bottoms, &c, for Lyonnesse, 26th April 1889 1889, Steel Ship Report for Lyonnesse, 27th April 1889 1889, Report on Machinery for Lyonnesse, 16th April 1889 1889, Report on Ship Forgings Form for Lyonnesse, Undated no date, Form of Particulars for Record of Material of Boilers for Lyonnesse, Undated no date )

The individual and/or organisation listed

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Hayle; Coasting ( Steel Ship Report for Lyonnesse, 27th April 1889 1889 )

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Vertical Inverted Tri Compound Surface Condensing ( Report on Machinery for Lyonnesse, 16th April 1889 1889 )