Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Lycia ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

05/11/1888 ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

198 ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Belfast ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Report on Auxiliary Boiler for Lycia, Undated no date )

Glasgow ( Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888 )

Liverpool ( Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887 )

Sheffield; Belfast ( Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887 )

London ( Tests of Boiler Steel for Lycia, 29th January 1887 1887, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893 )

Barry; Cardiff ( Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Note accompanying Barry Report 2782 for Lycia no date )

Cardiff ( Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron and Steel ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Report on Auxiliary Boiler for Lycia, Undated no date )

Iron & Steel ( Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Name of surveyor.

Surveyor

George Newcomb ( Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886 )

Peter McGregor ( Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887 )

Charles E Stromeyer ( Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887 )

James Turpin ( Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888 )

John Dawkins ( Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888 )

John Sanderson ( Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888 )

Edward John Tierney ( Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893 )

Henry E Tilston ( Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Note accompanying Barry Report 2782 for Lycia no date )

William Sibun ( Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897 )

The individual and/or organisation listed

Ship owner

City of Liverpool Steam Navigation Co ( Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888 )

City of Liverpool Ship Navigation Co ( Report on Machinery for Lycia, 12th May 1888 1888 )

City of Liverpool Steam Ship Co Ltd ( Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888 )

D & C MacIver ( Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893 )

Elder Dempster & Co ( Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Note accompanying Barry Report 2782 for Lycia no date )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion 3 Cranks & 3 Cylinders ( Report on Machinery for Lycia, 12th May 1888 1888 )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1888 ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harland & Wolff ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Donkey Boiler for Lycia, 1st May 1885 1885, Ship Forgings or Castings Form for Lycia, 2nd October 1886 1886, Ship Forgings Form for Lycia, 31st December 1886 1886, Plan of Browns Patent Ribbed Flue for Lycia, 1887 1887, Engine Forgings or Casting Form for Lycia, 6th September1887 1887, Receipt for materials manufactured by John Brown & Co Ltd for Lycia, 4th February 1887 1887, Engine Forgings or Castings Form for Lycia, 6th September 1887 1887, Tests of Boiler Steel for Lycia, 29th January 1887 1887, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding the testing of, & the weights of the anchors for Lycia, 19th May 1888 1888, Form for Particulars for Record of Double Bottoms, &c, in Lloyd's Register for Lycia, 14th May 1888 1888, Steel & Iron Ship Report for Lycia, 11th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report on Machinery for Lycia, 12th May 1888 1888, Form of Particulars for Record of Material of Boilers for Lycia, 15th May 1888 1888, Report of Survey for Repairs, &c for Lycia, 31st August 1888 1888, Report of Survey for Rapairs, &c, of Engines & Boilers for Lycia, 29th August 1888 1888, Report of Survey for Repairs, &c for Lycia, 5th September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Lycia, 4th September 1893 1893, Recommendations of Chief Surveyor on damage sustained by Lycia 22nd December 1897 1897, Report of Survey for Repairs, &c. for Lycia 8th December 1897 1897, Letter to Elder Dempster & Co from H Browne advising of what is needed to completed Special Survey No 1 for Lycia 21st December 1897 1897, Ship Forgings or Castings form for Lycia 13th August 1897 1897, Ship Forgings or Castings form for Lycia 3rd December 1897 1897, Receipt from Dowlais Cardiff works for a steel rudder plate 28th May 1897 1897, Report of Survey for Repairs, &c., of Engines and Boilers for Lycia 8th December 1897 1897, Proposed rudder plan for Lycia 5 May 1897 1897, Sketch of Rudder Stock Coupling 26 May 1897 1897, Letter enclosing Barry 2782 Report on Lycia 20th January 1898 1898, Memo stating survey for Lycia partly held 17th January 1898 1898, Letter from Henry E Tilston to Secretary enclosing copy of damage report for Lycia 14th January 1898 1898, Letter on Lycia 12th January 1898 1898, Letter from Henry E Tilston advising of damage sustained by Lycia in ice and repair recommendations 12th January 1898 1898, Report on Auxiliary Boiler for Lycia, Undated no date, Note accompanying Barry Report 2782 for Lycia no date )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.