Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Llanedarne ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
The process of transferring a vessel to water, but not necessarily her completion.
30/05/1877 ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Unique identifier for a given ship, it is assigned by a builder.
72 ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Location where a vessel’s survey was undertaken.
Newcastle on Tyne ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876 )
Newcastle ( Iron Ship Report for Llanedarne, 24th July 1877 1877 )
Hull ( Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877 )
Hull; Wallsend on Tyne ( Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877 )
Cardiff ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
A vessel’s means of propulsion.
undefined ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Plan of Boilers for Llanedarne, 5th January 1877 1877 )
Steam ( Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
The listed port to which a given vessel belongs.
Cardiff ( Iron Ship Report for Llanedarne, 24th July 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
David Davies ( Iron Ship Report for Llanedarne, 24th July 1877 1877 )
Boaz ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Baale ( Annual Surveys Report for Llanedarne, 7th June 1879 1879 )
Boase ( Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1; A & Cp; Lloyds MC; Dcot ( Iron Ship Report for Llanedarne, 24th July 1877 1877 )
100A1 ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879 )
+100A1 2,79 ( Annual Surveys Report for Llanedarne, 7th June 1879 1879 )
+100A1 ( Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879 )
100A1 6,79 ( Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
The name of the port/place of destination given.
Baltic ( Iron Ship Report for Llanedarne, 24th July 1877 1877 )
Cape de Verds ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879 )
Malta ( Annual Surveys Report for Llanedarne, 7th June 1879 1879 )
Type and configuration of the engine(s) supplied for a vessel.
2 Cylinder Compound Inverted Surface Condensing ( Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1877 ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Schlesinger, Davis & Co ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Broad categories and subdivisions of vessels related to their purpose or function.
Predominant material(s) utilised in a vessel’s construction.
Iron ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Llanedarne, 21st November 1876 1876, Profile Plan for Llanedarne, 16th November 1876 1876, Plan of Engine & Boiler Space for Llanedarne, 16th November 1876 1876, Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Plan of Boilers for Llanedarne, 5th January 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ship Report for Llanedarne, 24th July 1877 1877, Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
The individual and/or organisation listed
C E Stobytrass & Co ( Iron Ship Report for Llanedarne, 24th July 1877 1877, Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877 )
C E Stallybrass & Co ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
C E Stallybross & Co ( Annual Surveys Report for Llanedarne, 7th June 1879 1879 )
Name of surveyor.
William Moverly ( Iron Ship Report for Llanedarne, 24th July 1877 1877 )
A E Keydell ( Details of Main Boilers of the Steam Ship for Llanedarne, 7th June 1877 1877, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
A E Keydell; George W Manuel ( Engineer Surveyor's Report on Machinery for Llanedarne, 7th June 1877 1877 )
Henry T Tyrrell ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879 )
Recorded information related to a vessel’s movements.
Newcastle; Baltic ( Iron Ship Report for Llanedarne, 24th July 1877 1877 )
Cardiff; Cape de Verds ( Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879 )
Cardiff; Malta ( Annual Surveys Report for Llanedarne, 7th June 1879 1879 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1048 ( Iron Ship Report for Llanedarne, 24th July 1877 1877, Report of Survey for Repairs, &c for Llanedarne, 14th February 1879 1879, Annual Surveys Report for Llanedarne, 7th June 1879 1879, Report of Survey for Repairs of Engines & Boilers for Llanedarne, 11th June 1879 1879, Report of Survey for Repairs of Engines & Boiler for Llanedarne, 16th August 1879 1879 )
Location of construction for a vessel’s engines.
Have you noticed missing or incorrect data or images for this ship?