Name of ship as recorded on the record
Linden ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
The process of transferring a vessel to water, but not necessarily her completion.
__/05/1877 ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Unique identifier for a given ship, it is assigned by a builder.
81 ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Location where a vessel’s survey was undertaken.
Sunderland ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
South Shields; Newcastle ( Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
London ( Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Sail ( Report of Survey for Repairs, &c for Linden, 17th July 1878 1878 )
Is the steamer assisted by sail?
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
The listed port to which a given vessel belongs.
London ( Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John McDearmid ( Iron Ship Report for Linden, 7th June 1877 1877 )
J McDearrnia ( Annual Surveys Report for Linden, 19th September 1877 1877 )
Linden ( Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
R Robson ( Report of Survey for Repairs, &c for Linden, 17th July 1878 1878 )
Robert Robson ( Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
R Robinson ( Report of Survey for Repairs, &c for Linden, 24th January 1884 1884 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1; A & CP ( Iron Ship Report for Linden, 7th June 1877 1877 )
100A1 ( Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
+100A1 ( Report of Survey for Repairs, &c for Linden, 17th July 1878 1878 )
+100A1; conditionally ( Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
+100A1; Drp 84 ( Report of Survey for Repairs, &c for Linden, 24th January 1884 1884 )
The name of the port/place of destination given.
Cadiz ( Iron Ship Report for Linden, 7th June 1877 1877 )
London ( Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
Coasting ( Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
Type and configuration of the engine(s) supplied for a vessel.
Inverted Compound Surface Condensing ( Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877 )
Date in which construction of a vessel’s engines were completed.
A vessel’s calculated maximum speed.
The year in which a vessel’s construction is completed.
1877 ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Short Bros ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Broad categories and subdivisions of vessels related to their purpose or function.
Predominant material(s) utilised in a vessel’s construction.
Iron ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Linden, 17th November 1876 1876, Profile Plan for Linden, 17th November 1876 1876, Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Details of Main Boilers of the Steam Ship for Linden, June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
Lon ( Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
The individual and/or organisation listed
R B Avery ( Iron Ship Report for Linden, 7th June 1877 1877, Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877 )
Robert Thorman ( Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
R Thompson & Co ( Report of Survey for Repairs, &c for Linden, 17th July 1878 1878 )
R Thorman & Co ( Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Name of surveyor.
James Sibun ( Iron Ship Report for Linden, 7th June 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878 )
Thomas H Cooke ( Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
James Williamson ( Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
John William Miles ( Report of Survey for Repairs, &c for Linden, 24th January 1884 1884 )
George E Wilkinson ( Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Recorded information related to a vessel’s movements.
Sunderland; Cadiz ( Iron Ship Report for Linden, 7th June 1877 1877 )
South Shields; London ( Report of Survey for Repairs, &c for Linden, 26th December 1877 1877 )
Sunderland; Coasting ( Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1068 ( Iron Ship Report for Linden, 7th June 1877 1877, Annual Surveys Report for Linden, 19th September 1877 1877, Report of Survey for Repairs, &c for Linden, 26th December 1877 1877, Report of Survey for Repairs, &c for Linden, 17th July 1878 1878, Report of Survey for Repairs, &c; Through Damage for Linden, 23rd December 1879 1879, Report of Survey for Repairs, &c for Linden, 24th January 1884 1884, Report of Survey for Repairs of Engines & Boilers for Linden, 14th January 1884 1884 )
Location of construction for a vessel’s engines.
Sunderland ( Engineer Surveyor's Report on Machinery for Linden, 6th June 1877 1877 )
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship ( Details of Main Boilers of the Steam Ship for Linden, June 1877 1877 )
Sr - Schooner ( Report of Survey for Repairs, &c for Linden, 17th July 1878 1878 )