Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
City of Ripon ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date )
Lepanto ( Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
07/09/1915 ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
681 ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Location where a vessel’s survey was undertaken.
Greenock ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
Port Glasgiw ( Plan of Half Midship Section for City of Ripon, 1st September 1914 1914 )
Port Glasgow ( Longitudinal & Deck Plans for City of Ripon, 1914 1914 )
Port Glasgow; Greenock ( Steel Steamer Report for Lepanto, 29th November 1915 1915 )
Hull ( Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927 )
London ( Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927 )
Manchester ( Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927 )
Glasgow ( Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927 )
Sheffield ( Engine Forgings Form for Lepanto, 27th June 1927 1927 )
Darlington ( Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927 )
Stockton; Middlesbrough ( Report on Boilers for Lepanto, 15th June 1927 1927 )
Stockton on Tees ( Plan of Steel Boiler for Lepanto, 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927 )
Hallside; Stockton on Tees ( Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927 )
Port Natal ( Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
A vessel’s means of propulsion.
Steam ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date )
undefined ( Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Is the steamer assisted by sail?
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
The official record pronounced by the Committee
Sunk ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
South Atlantic ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
1913 ( Plan of Boiler for City of Ripon, 22nd October 1913 1913 )
1914 ( Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914 )
1915 ( Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
1927 ( Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927 )
1942 ( Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
0000 ( Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
The listed port to which a given vessel belongs.
Hull ( Steel Steamer Report for Lepanto, 29th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R A Harbord ( Steel Steamer Report for Lepanto, 29th November 1915 1915 )
Recorded information related to a vessel’s movements.
Port Glasgow; New York ( Steel Steamer Report for Lepanto, 29th November 1915 1915 )
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JMCR ( Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
William Joseph Tarn ( Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915 )
Ellerman's Wilson Line Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
Location of construction for a vessel’s engines.
Greenock ( Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
Name of surveyor.
William R Austin; James Innes ( Report on Machinery for Lepanto, 22nd November 1915 1915 )
James Innes ( Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
Arthur Scullard ( Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927 )
M Robertson ( Engine Forging Form for Lepanto, 20th May 1927 1927 )
George H Macadam ( Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927 )
The year in which a vessel’s construction is completed.
1915 ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Russell & Co ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Steel Steamer Report for Lepanto, 29th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Boilers for Lepanto, 15th June 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date )
undefined ( Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
A vessel’s calculated maximum speed.
1913 ( Plan of Boiler for City of Ripon, 22nd October 1913 1913 )
r 1914 ( Plan of Half Midship Section for City of Ripon, 1st September 1914 1914 )
1914 ( Longitudinal & Deck Plans for City of Ripon, 1914 1914 )
1915 ( Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
r 1927 ( Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927 )
1927 ( Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927 )
y 1927 ( Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927 )
1942 ( Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
ndated ( Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Recorded date for the vessel’s loss or disposal.
15/11/1942 ( Plan of Boiler for City of Ripon, 22nd October 1913 1913, Plan of Half Midship Section for City of Ripon, 1st September 1914 1914, Longitudinal & Deck Plans for City of Ripon, 1914 1914, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor regarding Greenock Report on 1st Entry Survey for Lepanto, 2nd December 1915 1915, Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915, Letter from Clerk of Classification Committee of Lloyd's Register, London, to Middlesbrough Surveyors referring to Middlesbrough Report of survey during construction on donkey boiler & informing of its satisfactory fitting to Lepanto, 27th September 1927 1927, Remarks of the Chief Ship Surveyor to Classing Committee regarding class subject to dry docking & specified repairs, for Lepanto, 22nd September 1927 1927, Report on Masts, Spars, & Rigging for Lepanto, 4th May 1927 1927, Memo regarding attaching copies to Hull Report & cancelling those forwarded with report for Lepanto, 7th October 1927 1927, Certificate of Inspection of Steam Superheater Elements for Lepanto, 26th August 1927 1927, Certificate of Inspection of Steam Superheater Headers for Lepanto, 26th August 1927 1927, Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Memo regarding attaching Hull Report for Lepanto, 4th October 1927 1927, Certificateof Testing by R K Macmillan, for Lepanto, 13th July 1927 1927, Engine Forgings Form for Lepanto, 27th June 1927 1927, Engine Forging Form for Lepanto, 20th May 1927 1927, Engine Castings Form for Lepanto, 29th June 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Letter from Hull Surveyors per George H Macadam to Secretary of Lloyd\'s Register, London, requesting report on Boiler No 5732 for Lepanto, 23rd August 1927 1927, Cover note for Plans for Lepanto, sent to Hull 24th August 1927 1927, Memo submitting that further action unnecessary until boiler is fitted on board a classed vessel, entered in \'Unclassed\' Boiler Book for Lepanto, 25th June 1927 1927, Report on Boilers for Lepanto, 15th June 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, returning Report on Electric Fittings duly signed as requested against alteration in description of cables for Lepanto, 4th October 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding report on Electric Fittings for Lepanto, 30th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding fee for additional electrical equipment fitted & awaiting signature for alteration as cables not correctly described for Lepanto, 27th September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors acknowledging receipt of letter respecting report on Electric Fittings, matter receiving attention & requesting return of Report for Lepanto, 26th September 1927 1927, Letter from Henry A Gibbs, Principal Hull Surveyor, to Secretary of Lloyd's Register, London, regarding responsibility for payment of fee & signature to sign report on Electrical fittings Lepanto, 23rd September 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding electric fittings for signature for Lepanto, 21st September 1927 1927, Memo regarding cables for Lepanto, 16th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Plan of Steel Boiler for Lepanto, 1927 1927, Plan of Donkey Boiler Recess for Lepanto, 6th April 1927 1927, Receipt for Stay Bars manufactured by The Steel Co of Scotland Ltd for Lepanto, 25th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 6th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 13th April 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 2nd May 1927 1927, Receipt for Boiler manufactured by The South Durham Steel & Iron Co Ltd for Lepanto, 10th May 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors regarding fitting of copper pipes to proposed auxiliary boiler, informing that copper pipes not to be used for superheated steam as requirement of Rules for Lepanto, 21st July 1927 1927, Memo regarding auxiliary vertical boilers & copper pipes for Lepanto, 21st July 1927 1927, Letter from J L Smith, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding additional vertical boiler in conjunction with the 3 main boilers of superheated steam, for Lepanto, 19th July 1927 1927, Letter from Secretary of Lloyd's Register, London, to Hull Surveyors returning plan of proposed donkey boiler for Lepanto, 10th May 1927 1927, Letter from Arthur Scullard, Hull Surveyor, to Secretary of Lloyd's Register, London, regarding the Donkey Boiler recess to be built in forward bulkhead in machinery space for Lepanto, 7th May 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date, Advice Note regarding Boiler maker Riley & Report No 12947 for Lepanto, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk ( Steel Steamer Report for Lepanto, 29th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
Hul ( Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927 )
Mdb ( Report on Boilers for Lepanto, 15th June 1927 1927 )
P.Nl ( Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
The individual and/or organisation listed
Thomas Wilson Sons & Co Ltd ( Steel Steamer Report for Lepanto, 29th November 1915 1915, Freeboard Verification form for Steamers for Lepanto, 11th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
Ellerman\'s Wilson Line Ltd ( Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927 )
Ellerman's Wilson Line Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk with Fbd 11,15; Lloyds A & CP; +LMC 11,15; FD ( Steel Steamer Report for Lepanto, 29th November 1915 1915 )
+LMC 11,15; FD ( Report on Machinery for Lepanto, 22nd November 1915 1915 )
Elec Light ( Report on Electric Lighting Installation for Lepanto, 25th November 1915 1915 )
+100A1; Shelter Dk With Fbd without Spl Condn; S S No 3,9-27; +LMC 9,27; N DB 2,27 ( Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927 )
+LMC 9,27; NDB 27 ( Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927 )
Not for Classing Committee; See Hul Rpt No 38334 ( Report on Boilers for Lepanto, 15th June 1927 1927 )
As now ( Report on Electric Fittings for Lepanto, 7th September 1927 1927 )
+100A1 5,42; S S Hul No 3 -9,27; S S Gls No 2 -35 Examined 3,41; +LMC MS 10,40; B S 5,42; TS 3,40; CL ( Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
+100A1; Shelter Dk with fbd 5,42; Examined 3,41; S S No 3-9,27; S S No 2-35; +LMC MS 10,40; NDB 27; TS 3,40 CL ( Report of Total Loss, Casualty, &c for City of Ripon, Undated no date )
The name of the port/place of destination given.
New York ( Steel Steamer Report for Lepanto, 29th November 1915 1915 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6389 ( Steel Steamer Report for Lepanto, 29th November 1915 1915, Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915 )
6368 ( Report of Survey for Repairs, &c for Lepanto, 10th September 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Report on Electric Fittings for Lepanto, 7th September 1927 1927, Certificate of Survey of Condenser for City of Ripon, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942, Report of Total Loss, Casualty, &c for City of Ripon, Undated no date )
The port in which a vessel is registered or permanently based.
Type and configuration of the engine(s) supplied for a vessel.
Vertical Reciprocating Direct Acting Triple Expansion ( Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915 )
Triple Expansion ( Report on Machinery for Lepanto, 22nd November 1915 1915 )
Date in which construction of a vessel’s engines were completed.
1915 ( Form for Vessels of 100 Tons & Upwards for Lepanto, 20th November 1915 1915, Report on Machinery for Lepanto, 22nd November 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Lepanto, 9th September 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for City of Ripon, 29th July 1942 1942 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.