Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Kilgerran Castle ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Daniel Henley ( Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917 )
The process of transferring a vessel to water, but not necessarily her completion.
24/01/1917 ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
664 ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Location where a vessel’s survey was undertaken.
Middlesbrough ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917 )
Wokingham; Swansea ( Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940 )
Swansea ( Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
A vessel’s means of propulsion.
undefined ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
Steam ( Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Is the steamer assisted by sail?
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
South West of Kinsale Head ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Recorded date for the vessel’s loss or disposal.
02/12/1940 ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917 )
Sws ( Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute Mdb FE Rpt 9670 ( Report on Boilers for Daniel Henley, 31st January 1916 1916 )
+100A1; Steam Trawler; Lloyd's A & CP; +LMC 3,17 ( Steel Steamer Report for Daniel Henley, 19th March 1917 1917 )
+LMC 3,17 ( Report on Machinery for Daniel Henley, 16th March 1917 1917 )
+100A1; Stm Trawler; BS 2,40 ( Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940 )
BS 2,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
+100A1; Steam Trawler 2,40; SS Sws No 3-9,29; SS Sws No 2-38; +LMC 9,38; BS 2,40; TS 12,37 CL ( Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Date in which construction of a vessel’s engines were completed.
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Steel Steamer Report for Daniel Henley, 19th March 1917 1917 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Daniel Henley, 16th March 1917 1917 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Sir John D Marsden Bart ( Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
John D Marsden ( Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
The year in which a vessel’s construction is completed.
1917 ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Smith's Dock Co Ltd ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Report on Machinery for Daniel Henley, 16th March 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
Screw Steamer ( Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913 )
Trawler ( Profile Plan for Daniel Henley, 6th October 1913 1913, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Bombed & Sunk ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
Ireland ( Plan of Boiler for Kilgerran Castle, 9th September 1913 1913, Amended Half Midship Section Plan for Daniel Henley & other vessels, 6th October 1913 1913, Profile Plan for Daniel Henley, 6th October 1913 1913, Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915, Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to Consolidated Fisheries Ltd, Swansea, informing that the Boiler Survey is now due on the Kilgerran Castle, 19th December 1939 1939, Question & Answer Memo between Wokingham & Swansea Offices, regarding the boiler survey for Kilgerran Castle, 19th January 1940 1940, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
The individual and/or organisation listed
Smiths Dock Co Ltd ( Request for Special Survey of Boiler for Daniel Henley, 27th May 1915 1915 )
The Admiralty ( Report on Boilers for Daniel Henley, 31st January 1916 1916, Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917 )
Consolidated Fisheries Ltd ( Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
Name of surveyor.
William Morrison ( Report on Boilers for Daniel Henley, 31st January 1916 1916 )
Location of construction for a vessel’s engines.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R N R ( Steel Steamer Report for Daniel Henley, 19th March 1917 1917 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
276 ( Steel Steamer Report for Daniel Henley, 19th March 1917 1917, Report on Machinery for Daniel Henley, 16th March 1917 1917, Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940, Report of Total Loss, Casualty, &c for Kilgerran Castle, Undated no date )
The listed port to which a given vessel belongs.
Swansea ( Report of Survey for Repairs, &c for Kilgerran Castle, 9th February 1940 1940 )
The port in which a vessel is registered or permanently based.
Swansea ( Report of Survey for Repairs, &c, of Engines & Boilers for Kilgerran Castle, 9th February 1940 1940 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.