Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Jurassic ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/06/1890 ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

340 ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow; Hull ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889 )

Stockton on Tees; Hull ( Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890 )

Stockton on Tess; Hull ( Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Glasgow ( Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890 )

Bolton ( Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890 )

Hull; Stockton ( Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890 )

Hull; Glasgow ( Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890 )

Hull ( Iron Ship Report for Jurassic, 23rd July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890 )

Stockton on Tees; Middlesbrough ( Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date )

Liverpool ( Engine Forgings Form for Jurassic, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Name of surveyor.

Surveyor

William Morrison ( Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Robert Hamilton ( Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890 )

Thomas Field ( Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890 )

Robert Williamson ( Iron Ship Report for Jurassic, 23rd July 1890 1890 )

James Innes ( Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890 )

Robert Haig ( Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date )

William Sibun ( Engine Forgings Form for Jurassic, Undated no date )

The listed port to which a given vessel belongs.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1; Steam Trawler; +LMC 7.90; LA&CP; TRW; DK ( Iron Ship Report for Jurassic, 23rd July 1890 1890 )

+LMC 7/90 ( Report on Machinery for Jurassic, 21st July 1890 1890 )

The name of the port/place of destination given.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Location of construction for a vessel’s engines.

The year in which a vessel’s construction is completed.

Year of ship completion

1890 ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Earles & Co ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hull ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Receipt of Material Manufactured by The Steel Co of Scotland Ltd for Jurassic, 23rd December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 21st December 1889 1889, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 5th February 1890 1890, Receipt for Material Manufactured by Moor Steel & Iron Co Ltd for Jurassic, 31st January 1890 1890, Receipt of Steel Bars Manufactured by William Bearmore & Co for Jurassic, 15th April 1890 1890, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 18th March 1890 1890, Receipt for Bars manufactured by The Bolton Iron & Steel Co Ltd for Jurassic, 17th December 1890 1890, Receipt of Materials manufactured by The Stockton Malleable Iron Co Ltd for Eearls & Co & signed by Robert Harvey, Lloyds Surveyor, for Jurassic, 9th January 1890 1890, Receipt with specifications for order from The Steel Co of Scotland, signed by S J P Thearle, 10th April 1890 1890, Iron Ship Report for Jurassic, 23rd July 1890 1890, Form of Particulars for Record of Material of Boilers for Jurassic, July 1890 1890, Report on Machinery for Jurassic, 21st July 1890 1890, Cover note for Jurassic report sent to Grimsby, 27th August 1914 1914, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Engine Forgings Form for Jurassic, Undated no date, Receipt for materials manufactured by The Stockton Malleable Iron Co Ltd for Jurassic, Undated no date, Receipt for Steel & Boiler Plates manufactured by Moor Steel & Iron Co Ltd for Jurassic, 24th February no date )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The individual and/or organisation listed

Recorded information related to a vessel’s movements.

Voyage information

Hull; Fishing ( Iron Ship Report for Jurassic, 23rd July 1890 1890 )

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Compound Inverted Direct Acting; Triple Expansion ( Report on Machinery for Jurassic, 21st July 1890 1890 )

Date in which construction of a vessel’s engines were completed.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.