Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

James Hall ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/04/1870 ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Aberdeen ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The listed port to which a given vessel belongs.

Port belonging to

Aberdeen ( Iron Ships Report for James Hall, 28th May 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

A Linplater ( Iron Ships Report for James Hall, 28th May 1870 1870 )

Andrew Linklater ( Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870 )

A Linklater ( Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879 )

Urquhart ( Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879 )

Urguhart ( Annual Surveys Report for James Hall, 16th October 1880 1880 )

Wright ( Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886 )

A Wright ( Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887 )

A McDonald ( Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

McDonald ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893 )

A MacDonald ( Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895 )

A McGormaud ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896 )

Location where a vessel’s survey was undertaken.

Location of Survey

Aberdeen ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Aberdeen; Dundee ( Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879 )

Recorded information related to a vessel’s movements.

Voyage information

Aberdeen; Hull ( Iron Ships Report for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875 )

Aberdeen; Coasting ( Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Aberdeen; Hamburg ( Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886 )

Aberdeen; Leith ( Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895 )

A vessel’s means of propulsion.

Propulsion

Steam ( Iron Ships Report for James Hall, 28th May 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

undefined ( Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899 )

Sail ( Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The year in which a vessel’s construction is completed.

Year of ship completion

1870 ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Hall Russell & Co ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Irn ( Iron Ships Report for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880 )

Abn ( Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The individual and/or organisation listed

Ship owner

Aberdeen & Hall Steam Co ( Iron Ships Report for James Hall, 28th May 1870 1870 )

Aberdeen & Hull Steam Co ( Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874 )

Aberdeen Hull Steam Co ( Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875 )

Aberdeen Newcastle & Hull Steam Ship Navigation Co Ltd ( Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876 )

Aberdeen Newcastle & Hull Steam Co ( Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879 )

Aberdeen Newcastle Hull Steam Co ( Annual Surveys Report for James Hall, 16th October 1880 1880 )

Aberdeen Newcastle Hull Steam Nav Co ( Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882 )

Aberdeen, Newcastle & Hull Steam Navigation Co Ltd ( Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885 )

Aberdeen Newcastle & Hull Steam Navigation Co ( Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886 )

Aberdeen Newcastle & Hull Steam N Co ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886 )

Aberdeen, Newcastle & Hull Steam Shipping Co ( Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887 )

Aberdeen Leith Mersay Firth Steam Ship Co Ltd ( Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890 )

Aberdeen Leith & Moray Firth Steam Shipping Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898 )

Aberdeen, Leith & Moray Firth Steam Shipping Co Ltd ( Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894 )

Aberdeen Leith & Moray Firth Steam Ship Co Ltd ( Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895 )

Aberdeen Leith & Moray Firth S S Co ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896 )

Aberdeen Leith & Moray Firth S S Co Ltd ( Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Name of surveyor.

Surveyor

Thomas W Kettle ( Iron Ships Report for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885 )

Thomas Edwards ( Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876 )

John Sturrock ( Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882 )

Maurice Ritson ( Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

90A1; A&Cp ( Iron Ships Report for James Hall, 28th May 1870 1870 )

90A1; S S no 1.74 ( Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874 )

90A1 ( Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894 )

90A1; Lloyds MC 10,79; S S no 2,79 ( Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879 )

90A1; 10,76 ( Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879 )

90A1; S S no3-82 ( Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882 )

90A1; LMC 11 82 ( Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882 )

90A1; S S No 1-86; LMC 11.86 ( Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886 )

LMC 11.86 ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886 )

90 A1; S S 12.87 ( Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887 )

S S 12.87 ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887 )

90A1; S S3/90 ( Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890 )

S S 3/90 ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890 )

Deferred for repairs; Deferred Write Abn ( Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893 )

Deferred for No3 ( Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895 )

90 A1; LMC 5,95 ( Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895 )

LMC 5,95 ( Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895 )

+90A1; S S Abn No 3 - 5,95; +LMC 5,95; +NB 12,92 ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896 )

+90A1; LMC 5,95 ( Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898 )

90A1; LMC 5-95 ( Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898 )

90A1; LMC 4.99; Note Rpt to Lth 5/6/99 ( Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899 )

LMC 4.99 ( Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899 )

Deferred for compln No 1; permanent repairs ( Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

The name of the port/place of destination given.

Destined voyage

Hull ( Iron Ships Report for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875 )

Coasting ( Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Hamburg ( Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886 )

Laid Up ( Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887 )

Leith ( Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

349 ( Iron Ships Report for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887 )

221 ( Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Annual Surveys Report for James Hall, 16th October 1880 1880 )

346 ( Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890 )

366 ( Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

336 ( Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Iron Ships Report for James Hall, 28th May 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Half Midship Section Plan for James Hall, 1870 1870, Certificate for Vessels Navigated by Steam for James Hall, 28th May 1870 1870, Report of Survey for Repairs, &c for James Hall, 11th November 1874 1874, Report of Survey for Repairs, &c for James Hall, 15th October 1875 1875, Report of Survey for Repairs, &c for James Hall, 28th October 1876 1876, Report of Survey for Repairs, &c for James Hall, 25th October 1879 1879, Report of Survey for Repairs of Engines & Boilers for James Hall, 23rd October 1879 1879, Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879, Plan of engine & boiler space for James Hall, 1879 1879, Annual Surveys Report for James Hall, 16th October 1880 1880, Report of Survey for Repairs, &c for James Hall, 12th December 1882 1882, Report of Survey for Repairs of Engines & Boilers for James Hall, 25th November 1882 1882, Report of Survey for Repairs, &c for James Hall, 20th April 1885 1885, Report of Survey for Repairs, &c for James Hall, 19th August 1886 1886, Report of Survey for Repairs, &c for James Hall, 18th November 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 19th November 1886 1886, Report of Survey for Repairs, &c. for James Hall, 31st December 1887 1887, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 31st December 1887 1887, Report of Survey for Repairs & Co for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 26th March 1890 1890, Report of Survey for Repairs, &c for James Hall, 9th October 1893 1893, Report of Survey for Repairs, &c for James Hall, 22nd February 1894 1894, Report of Survey for Repairs, &c for James Hall, 9th April 1895 1895, Report of Survey for Repairs, &c for James Hall, 29th May 1895 1895, Report of Survey for Reparis, &c, of Engines & Boilers for James Hall, 29th May 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 17th February 1896 1896, Report of Surevy for Repairs, &c for James Hall, 21st April 1898 1898, Report of Survey for Repairs, &c for James Hall, 18th October 1898 1898, Report of Survey for Repairs, &c for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for James Hall, 29th April 1899 1899, Report of Survey for Repairs, &c for James Hall, 27th November 1899 1899 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Compound Inverted Cylinders Surface Condensing ( Engineer Surveyor's Report on Machinery for James Hall, 23rd October 1879 1879 )

Report an issue with this ship