Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
James H Beazley ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
The process of transferring a vessel to water, but not necessarily her completion.
09/06/1921 ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Unique identifier for a given ship, it is assigned by a builder.
582 ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Location where a vessel’s survey was undertaken.
Dartmouth ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919 )
Glasgow ( Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920 )
Plymouth ( Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921 )
London ( Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957 )
Dartmouth; Plymouth ( Steel Steamer Report for James H Beazley, 26th September 1921 1921 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958 )
Paisley; Glasgow ( Report on Boilers for James H Beazley, 13th March 1921 1921 )
Birkenhead; Liverpool ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957 )
London; Liverpool ( Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958 )
A vessel’s means of propulsion.
Steam ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Is the steamer assisted by sail?
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Is machinery fitted at the aft of the vessel?
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to for Breaking up ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
The listed port to which a given vessel belongs.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyd's A & CP; +LMC 9,21; CL ( Steel Steamer Report for James H Beazley, 26th September 1921 1921 )
+LMC 9,21; CL ( Report on Machinery for James H Beazley, 26th September 1921 1921 )
See Ply F E 6110 ( Report on Boilers for James H Beazley, 13th March 1921 1921 )
Elec Lt ( Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921 )
+100A1 8,57; SS (Dr) 10,46; Liv 10,54; +LMC 10,54; BS 10,56; TS CL 8,57; SPS 9,54 ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957 )
Deferred for Comp BS ( Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957 )
+100A1 10,56; SS (Dr) 10,46; Liv 10,54; +LMC 10,54; BS 10,56; TS CL 8,54; SPS 9,54 ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957 )
Deferred for Drydocking ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957 )
+100A1 8,57; SS (Dr) 10,46; Liv 10,54; +LMC 10,54; BS M 7,57; Sp 9,54; TS 8,57; CL ( Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
459 ( Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Type and configuration of the engine(s) supplied for a vessel.
Vertical Triple Expansion Direct Acting ( Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921 )
Vertical Inverted Triple Expansion S C ( Report on Machinery for James H Beazley, 26th September 1921 1921 )
Engine Cylinder ( Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921 )
T 3 Cylinders ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957 )
Recirprocating T 3 Cylinder ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957 )
Recirprocating T 3 Cylinders ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957 )
Date in which construction of a vessel’s engines were completed.
1921 ( Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957 )
The year in which a vessel’s construction is completed.
1921 ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Philip & Son Ltd ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
The port or place in which the vessel’s construction took place, at the time of writing.
Dartmouth ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Broad categories and subdivisions of vessels related to their purpose or function.
Pilot ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958 )
undefined ( Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Does the vessel possess an auxiliary power source?
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Is electric lighting fitted to the vessel?
No ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
The official record pronounced by the Committee
To be broken up ( Sternpost & Rudder Plan for James H Beazley, 24th November 1919 1919, General Arrangement Plan for James H Beazley, 16th December 1919 1919, Midship Section Plan for James H Beazley, 16th December 1919 1919, Request for Special Survey of Boilers for James H Beazley, 6th December 1920 1920, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 3rd December 1921 1921, Letter from James C Larg, Surveyor, Lloyd\'s Register, Plymouth to The Secretary of Lloyd\'s Register regarding James H Beazley, 26th November 1921 1921, Copy of a Letter from Secretary of Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Glasgow, regarding James H Beazley, 1st November 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of James H Beazley, 26th October 1921 1921, Steel Steamer Report for James H Beazley, 26th September 1921 1921, Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Boilers for James H Beazley, 13th March 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Copy of a Certificate of Survey Part Boiler for James H Beazley, 9th December 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Boiler Survey, 21st November 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Deferred Repairs for James H Beazley, 26th September 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Copy of a Certificate of Survey of Repairs for James H Beazley, 5th September 1957 1957, Copy of a Certificate of Survey of Part Machinery for James H Beazley, 28th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 23rd August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 26th August 1957 1957, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary, Lloyd\'s Register, London, regarding James H Beazley, 23rd August 1957 1957, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Copy of a Letter from pro Clerk to the Classification Committee, Lloyd\'s Register, London to The Secretary, Lloyd\'s Register, Liverpool, regarding James H Beazley, 22nd August 1957 1957, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding pt Mbs for James H Beazley, 20th August 1957 1957, Copy of a Certificate of Survey of Boiler for James H Beazley, 1st August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, Lloyd\'s Register to The Secretary of Lloyd\'s Register regarding James H Beazley, 14th July 1958 1958, Report of Total Loss, Casualty, &c for James H Beazley, 24th July 1958 1958 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ply ( Steel Steamer Report for James H Beazley, 26th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921 )
Gls ( Report on Boilers for James H Beazley, 13th March 1921 1921 )
Liv ( Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957 )
The individual and/or organisation listed
Mersey Docks & Harbour Board ( Steel Steamer Report for James H Beazley, 26th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957, Question & Answer Memo between London & Liverpool Offices, regarding James H Beazley being Breaking up, 17th July 1958 1958 )
The Mersey Docks & Harbour Board ( Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for James H Beazley, 26th September 1921 1921, Report on Machinery for James H Beazley, 26th September 1921 1921, Report on Electric Lighting Installation for James H Beazley, 6th September 1921 1921 )
Pol - Polacre ( Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921 )
The port in which a vessel is registered or permanently based.
Liverpool ( Form for Vessels of 100 Tons & Upwards for James H Beazley, 5th September 1921 1921, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 9th December 1957 1957, Report of Ship Surveys & Repairs for James H Beazley, 3rd September 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 26th August 1957 1957, Report of Periodical Surveys & Repairs of Machinery for James H Beazley, 1st August 1957 1957 )
Location of construction for a vessel’s engines.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.