Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Irene M ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957 )

Thyra Menier ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Lina Fisser ( Steel Steamer Report for Lina Fisser, 19th September 1912 1912 )

Empire Conderton ( Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Freeboard & Draught Document for Empire Conderton, Undated no date )

Marchmont ( Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

13/08/1912 ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

168 ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Blyth ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912 )

Blyth; Newcastle on Tyne ( Steel Steamer Report for Lina Fisser, 19th September 1912 1912 )

Bristol ( Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912 )

South Shields; Newcastle on Tyne ( Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912 )

Newcastle on Tyne ( Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Sharpness; Bristol ( Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956 )

Barry ( Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947 )

London ( Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948 )

Montreal ( Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957 )

Rimouski PQ; Montreal ( Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957 )

A vessel’s means of propulsion.

Propulsion

Steam ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

undefined ( Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Broken up ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

The name of the port/place of destination given.

The year in which a vessel’s construction is completed.

Year of ship completion

1912 ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Blyth Shipbuilding & Dry Docks Co Ltd ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Blyth ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Screw Steamer ( Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Broken up ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Sorel ( Elevation & Deck Arch Principle of Construction Plan for Irene M, 29th January 1912 1912, Half Midship Section Plan for Irene M, 29th January 1912 1912, Plan of Forged Iron Stern & Rudder Frames for Irene M, 8th February 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Thyra Menier, 23rd September 1912 1912, Steel Steamer Report for Lina Fisser, 19th September 1912 1912, Form for Vessels of 100 Tons & Upwards for Thyra Menier, 12th September 1912 1912, Report on Machinery for Thyra Menier, 12th September 1912 1912, Report on Boilers for Thyra Menier, 5th September 1912 1912, Sketch of Forecastle for Thyra Menier, 27th April 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 16th May 1912 1912, Calculation of Reserve Buoyancy for Thyra Menier, 15th May 1912 1912, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, 1st May 1912 1912, Report of Surveys for Freeboard for Empire Conderton, 16th October 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Empire Conderton, 16th October 1945 1945, Letter from J E Annear, for the Barry Surveyors, to the Secretary for Lloyd's Register returning report for Marchmont, 9th October 1947 1947, Annual Load Line Survey notice sent to Marchment Steamship Co Ltd, owners of Marchmont Steam Ship Co Ltd, 15th June 1948 1948, Letter from C R Hadoulis, Director of J P Hadoulis Ltd, to the Secretary for Lloyd's Register regarding Marchmont, 16th June 1948 1948, Report C.11 continued, Alterations to Conditions of Assignment of Load lines for Irene M, 15th August 1956 1956, Report of Total Loss, Casualty, &c for Irene M, 3rd October 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Letter from N R Parsons, for the Principal Surveyor for Canada, to the Secretary for Lloyd\'s Register regarding Irene M, 24th September 1957 1957, Remarks of the Chief Ship Surveyor regarding deferral of action relating to Irene M, 22nd May 1957 1957, Report of Survey for Repairs, &c for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Temporary Repairs for Irene M, 27th April 1957 1957, Copy of a Certificate of Survey of Part Boilers & Part Machinery for Irene M, 27th April 1957 1957, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding repairs to engines & boilers for Irene M, 27th May 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Irene M, 27th April 1957 1957, Freeboard & Draught Document for Empire Conderton, Undated no date, Report of Surveys for Freeboard-Steam Ships for Thyra Menier, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.