Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

The process of transferring a vessel to water, but not necessarily her completion.

Unique identifier for a given ship, it is assigned by a builder.

Location where a vessel’s survey was undertaken.

Predominant material(s) utilised in a vessel’s construction.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Does the vessel possess an auxiliary power source?

Is electric lighting fitted to the vessel?

The official record pronounced by the Committee

Recorded date for the vessel’s loss or disposal.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Is machinery fitted at the aft of the vessel?

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking up purposes ( Half Midship Section Plan for Indrasamha, 1900 1900, Profile Plan for Indrasamha, 1900 1900 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.