Name of ship as recorded on the record

Ship name

Ibero ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

05/05/1926 ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

372 ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Annan ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923 )

Glasgow ( Plan of Main Boiler for Ibero, 25th November 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926 )

Glasgow; Annan ( Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925 )

Greenock ( Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926 )

London ( Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930 )

Port Glasgow; Greenock ( Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926 )

Annan; Glasgow ( Report on Boilers for Ibero, 23rd February 1926 1926 )

Greenock; Glasgow ( Report on Electric Fittings for Ibero, 24th July 1926 1926 )

Port Glasgow ( Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926 )

Liverpool ( Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929 )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Posted Missing ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Date in which construction of a vessel’s engines were completed.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Penarth Head; Barcelona ( Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930 )

Recorded information relating the specific cargo being conveyed.

The year in which a vessel’s construction is completed.

Year of ship completion

1926 ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Robert Duncan & Co ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Screw Steamer ( Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Missing ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

21/01/1930 ( Plan of Cochran Patent Vertical Multitubular Boiler for Ibero, 1923 1923, Plan of Main Boiler for Ibero, 25th November 1925 1925, Receipt for Boiler Plates Manufactured by David Colville & Sons Ltd for Ibero, 24th January 1925 1925, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd\'s Register, London, regarding report for Ibero, 25th June 1926 1926, Letter from Kenneth Inglis, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding main frame thickness for Ibero, 24th June 1926 1926, Letter from the Clerk to the Classification Committee to the Secretary for Lloyd\'s Register, Glasgow, regarding main frame thickness for Ibero, 21st June 1926 1926, Letter from A P W McNab, Greenock Surveyor, to the Secretary for Lloyd\'s Register regarding classification certificates & ship plans for Ibero, 15th June 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry Survey & class for Ibero, 17th June 1926 1926, Steel Steamer or Motorship Report for Ibero, 10th June 1926 1926, Request for Special Survey for Ibero, 19th January 1926 1926, Report on Machinery for Ibero, 9th June 1926 1926, Report on Steam Reciprocating Engine Machinery for Ibero, 1st May 1926 1926, Report on Boilers for Ibero, 23rd February 1926 1926, Report on Electric Fittings for Ibero, 24th July 1926 1926, Profile & Deck Plan for Ibero, 10th June 1926 1926, Half Midship Section Plan for Ibero, 10th June 1926 1926, Memo to the Chief Ship Surveyor regarding Docking Survey for Ibero, 2nd October 1929 1929, Report of Survey for Repairs, &c for Ibero, 26th September 1929 1929, Certificate of Survey of Repairs for Ibero, 26th September 1929 1929, Certificate of Survey of Tailshaft & Part Machinery for Ibero, 26th September 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Ibero, 28th September 1929 1929, Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930, Letter from W A J Boxford, Clerk to the Committee, to the Secretary for Lloyd\'s Register regarding the posting of Ibero as missing, 14th May 1930 1930, Calculations regarding rivets, screw stays, Front Tube Plate, girders & furnaces for Ibero, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

The name of the port/place from which a vessel’s voyage originated.

The name of the port/place of destination given.

Destined voyage

Penarth Head; Barcelona ( Report of Total Loss, Casualty, &c for Ibero, 2nd June 1930 1930 )