The year in which a vessel’s construction is completed.
1892 ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
1891 ( Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Broad categories and subdivisions of vessels related to their purpose or function.
Predominant material(s) utilised in a vessel’s construction.
Iron & Steel ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892 )
Iron and Steel ( Half Midship Section Plan for Howth, 8th June 1891 1891, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
Iron ( Ship Forgings for Howth, 1892 1892 )
Steel ( Ship Forgings for Howth, 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Does the vessel possess an auxiliary power source?
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Is electric lighting fitted to the vessel?
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Name of ship as recorded on the record
Howth ( Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Name of surveyor.
John Dykes ( Ship Forgings for Howth, 1892 1892 )
A Campbell Holms ( Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
James Turpin ( Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892 )
The listed port to which a given vessel belongs.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
R Martin & Co ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; LA & CP; 1Dk (pt Stl-WS) 2 trB ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
+100A1 ( Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
The name of the port/place of destination given.
San Francisco ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
Freemantle ( Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
The process of transferring a vessel to water, but not necessarily her completion.
23/12/1891 ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Unique identifier for a given ship, it is assigned by a builder.
89 ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Location where a vessel’s survey was undertaken.
Belfast ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
London ( Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
A vessel’s means of propulsion.
Sail ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
undefined ( Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Is the steamer assisted by sail?
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Head Shewing Bowsprit & Bowsprit Connection to deck for Howth, 4th December 1891 1891, Plan of Bowsprit for Howth, 10th December 1891 1891, Half Midship Section Plan for Howth, 8th June 1891 1891, Ship Forgings for Howth, 1892 1892, Ship Forgings for Howth, 1892 1892, Letter from A Campbell Holms, To The Secretary, London, regarding Howth, 10th March 1892 1892, Memo regarding Classification Particulars for Howth, 9th March 1892 1892, Memo regarding classification for Howth, 11th March 1892 1892, Letter from James Turpin to the Secretary, Lloyd's Register of Shipping, London, regarding deviation from the rules for Howth, 12th March 1892 1892, Telegram to the Committee, London, regarding loading of Howth, 14th March 1892 1892, Telegram from the Belfast Surveyors to the Committee, London regarding approval for Howth, 11th March 1892 1892, Telegram to the Belfast Surveyors from the Committee approving section for Howth, 11th March 1892 1892, Cover Note for report for Howth, sent to Port of Belfast, 9th March 1892 1892, Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Physical arrangement of a ship’s masts, sails and rigging.
The individual and/or organisation listed
R Martin & Co ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
Sir R Martin & Co ( Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R F Martin ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
B A Martin ( Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
Recorded information related to a vessel’s movements.
Belfast; San Francisco ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892 )
London; Freemantle ( Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2244 ( Iron or Steel Sailing Ship Report for Howth, 7th March 1892 1892, Report of Survey for Repairs, &c for Howth, 2nd April 1898 1898 )