Hornby ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Note for Hornby, undated no date )

Holman ( Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

22/01/1908 ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

66 ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

The Alexandra Towing Co Ltd ( Steel Tug Steamer Report for Hornby, 29th February 1908 1908 )

Recorded information related to a vessel’s movements.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Compound Surface Condensing ( Report on Machinery for Hornby, 17th February 1908 1908 )

The year in which a vessel’s construction is completed.

Year of ship completion

1908 ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Cran & Co ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Leith ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tug ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Memo regarding classification for Holman, 30th December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date )

undefined ( Report on Boilers for Hornby, 14th December 1907 1907, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Note for Hornby, undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Hornby, October 1907 1907, Profile & Deck Plan for Hornby, 16th October 1907 1907, Report on Boilers for Hornby, 14th December 1907 1907, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 2nd March 1908 1908, Letter from J R Henderson, to The Secretary, London, regarding Hornby, 4th March 1908 1908, Steel Tug Steamer Report for Hornby, 29th February 1908 1908, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hornby, 13th February 1908 1908, Ship Forgings Form for Hornby, 10th February 1908 1908, Certificate of Survey of Damage for Hornby, 11th February 1908 1908, Report of Survey for Repairs, &c for Hornby, 11th February 1908 1908, Report on Machinery for Hornby, 17th February 1908 1908, Report of Surveys for Freeboard-Steam Ships for Holman, 21st June 1932 1932, Report of Surveys for Freeboard for Hornby, 14th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 15th June 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey Boilers of Holman, 21st September 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Holman, 16th September 1936 1936, Memo regarding classification for Holman, 30th December 1937 1937, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Holman, 22nd December 1937 1937, Letter from D MacFarlane, per The Surveyors, to The Secretary, London, regarding Holman, 16th December 1937 1937, Letter from W George Anna, Director, for & on behalf of The Newport Screw Towing Co Ltd, to Lloyd\'s Register of Shipping, Newport Mon, regarding Holman, 13th December 1937 1937, Letter from pro Secretary, to The Newport Screw Towing Co Ltd, Newport Mon, regarding Holman, Undated no date, Report of Survey for Repairs, &c for Holman, Undated no date, Note for Hornby, undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The name of the port/place of destination given.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.