Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

H C Hull ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

21/10/1925 ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

207 ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Kings Lynn ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925 )

King\'s Lynn ( Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925 )

Ipswich ( Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926 )

London ( Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Report of Survey for Repairs, &c for H C Hull, Undated no date )

Dartmouth ( Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925 )

Kings Lynn; London; Ipswich ( Steel Steamer Report for H C Hull, 10th December 1925 1925 )

King's Lynn ( Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925 )

Great Yarmouth; Kings Lynn; London; Ipswich ( Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925 )

Stockton on Tees; Middlesbrough ( Report on Boilers for H C Hull, 1st September 1925 1925 )

Plymouth ( Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926 )

Dartmouth; Plymouth ( Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926 )

London; Cape Town ( Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928 )

London; Ipswich ( Report on Electric Lighting Installation for H C Hull, 26th November no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928 )

undefined ( Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Draft

1925 ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925 )

1926 ( Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926 )

1928 ( Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928 )

0000 ( Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Name of surveyor.

The name of the port/place of destination given.

The year in which a vessel’s construction is completed.

Year of ship completion

1925 ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Kings Lynn Slipway Co Ltd ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Kings Lynn ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date )

Tug ( Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926, Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928, Report of Survey for Repairs, &c for H C Hull, Undated no date, Report on Electric Lighting Installation for H C Hull, 26th November no date )

A vessel’s calculated maximum speed.

Speed (knots)

1925 ( Plan of Stern Frame, Rudder & Tillers for H C Hull, 25th June 1925 1925, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 23rd December 1925 1925, Memo for H C Hull, 17th December 1925 1925, Letter from R H Hutchinson, Managine Director, per L P Y, for & on behalf of, per, The King's Lynn Slipway Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding H C Hull, 16th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of H C Hull, 10th December 1925 1925, Telegram from the Committee, London, to Lloyd\'s Register, Plymouth, regarding H C Hull, 16th December 1925 1925, Copy of Letter from Assistant to the Secretary, to P T Brown, Plymouth, regarding H C Hull, 16th December 1925 1925, Telegram from P T Brown, Dartmouth Surveyor, to the Committee, London, regarding H C Hull, 16th December 1925 1925, Steel Steamer Report for H C Hull, 10th December 1925 1925, Request for Special Survey of Boilers & Engines for H C Hull, 24th June 1925 1925, Report on Steam Reciprocating Engine Machinery for H C Hull, 10th December 1925 1925, Report on Boilers for H C Hull, 1st September 1925 1925 )

e 1925 ( Half Midship Section & Profile & Deck Plan for H C Hull, 22nd June 1925 1925 )

1926 ( Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 26th March 1926 1926, Copy of Letter from Secretary, to The Secretary, regarding H C Hull, 26th March 1926 1926, Memo regarding Classification for H C Hull, 24th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 22nd March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 18th March 1926 1926, Memo for H C Hull, 17th March 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 16th March 1926 1926, Copy of Letter from Secretary, to P T Brown, Plymouth, regarding H C Hull, 12th March 1926 1926, Memo for H C Hull, 11th March 1926 1926, Letter from Director of Stores & Shipping, to The Chief Ship Surveyor, Lloyd\'s Register, London, regarding H C Hull, 5th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to A E Farminer Esq, Ipswich, regarding H C Hull, 15th February 1926 1926, Letter from A E Farminer, to The Secretary, London, regarding H C Hull, 9th February 1926 1926, Copy of Letter from Assistant to the Secretary, to A E Farminer Ipswich, regarding H C Hull, 2nd February 1926 1926, Letter from P T Brown, to The Secretary, London, regarding H C Hull, 30th January 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Damage of H C Hull, 27th January 1926 1926, Report of Survey for Repairs, &c for H C Hull, 22nd January 1926 1926 )

y 1926 ( Copy of Certificate of Survey of Repairs for H C Hull, 21st January 1926 1926 )

1928 ( Memo regarding Classification for H C Hull, 15th March 1928 1928, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for H C Hull, 3rd March 1928 1928, Question & Answer Memo between London & Cape Town Office, regarding H C Hull being Screwshaft, 11th January 1928 1928 )

ndated ( Report of Survey for Repairs, &c for H C Hull, Undated no date )

mber ( Report on Electric Lighting Installation for H C Hull, 26th November no date )

The port in which a vessel is registered or permanently based.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

Recorded information related to a vessel’s movements.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.