Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Egill Skallagrimsson ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916 )
Grimso ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
The process of transferring a vessel to water, but not necessarily her completion.
06/03/1916 ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Unique identifier for a given ship, it is assigned by a builder.
663 ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Location where a vessel’s survey was undertaken.
Selby ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915 )
Hull ( Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916 )
Glasgow; Hull ( Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915 )
Selby; Hull ( Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916 )
London; Gothenburg ( Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949 )
Gothenburg ( Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949 )
London; Copenhagen ( Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951 )
London ( Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Does the vessel possess an auxiliary power source?
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Is electric lighting fitted to the vessel?
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
The official record pronounced by the Committee
Broken up ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Recorded date for the vessel’s loss or disposal.
__/04/1952 ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
The listed port to which a given vessel belongs.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Stm Trawler; +LMC 9,16; Lloyds A & CP ( Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916 )
+LMC 9,16 ( Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916 )
Deferred ( Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949 )
+100A1; Stm Trawler 5,48; S S Els 2nd No 3-3,46; +LMC 3,46; BS 11,47; TS 11,46; CL ( Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Type and configuration of the engine(s) supplied for a vessel.
Triple ( Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916 )
Date in which construction of a vessel’s engines were completed.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Allan Erlandsson ( Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949 )
The name of the port/place of destination given.
Gothenburg ( Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949 )
The year in which a vessel’s construction is completed.
1916 ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Sons Ltd ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
The port or place in which the vessel’s construction took place, at the time of writing.
Selby ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
A vessel’s means of propulsion.
Steam ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
undefined ( Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951 )
Is the steamer assisted by sail?
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold For Breaking Up, Demolition was Commenced ( Plan of Half Midship Section for Egill Skallagrimsson, 1st September 1915 1915, Plan of Steel Boiler for Egill Skallagrimsson, 4th August 1915 1915, Plan of Profile & Deck for Egill Skallagrimsson, 1st September 1915 1915, Advice note from The Steel Co of Scotland Ltd; Amos & Smith Ltd regarding Boiler Plates for Egill Skallagrimsson, 22nd December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Egill Skallagrimsson, 11th October 1916 1916, Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers Partly Held of Grimso, 3rd November 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Gothenburg, stating that the Grimso is still Laid Up & arrangements have been made for the Boiler Survey to be carried out shortly, 24th June 1949 1949, Form of Postponed Surveys for Grimso, 23rd June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 13th June 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 4th May 1949 1949, Question & Answer Memo between London & Gothenburg Office regarding Boiler Survey for Grimso, 7th February 1949 1949, Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Letter from Clerk to the Classification Committee of Lloyd's Register, to The Surveyors, Copenhagen, stating that the Committee have given instructions for a notation of 'Laid Up pending survey' to be assigned in the case of the Grimso, 1st November 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 12th October 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Survey for Grimso, 1st June 1950 1950, Memo for the Chief Surveyors with their annotations regarding the boiler survey partly held for Grimso, 1st April 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Boiler Survey for Grimso, 21st March 1950 1950, Memo for the Chief Engineer Surveyor with their annotations regarding the boiler survey partly held for Grimso, 24th January 1950 1950, Letter from Surveyor to Lloyd's Register, Copenhagen, to The Secretary, Lloyd's Register, London, informing that the Grimso is now Sold & the intention is to alter her to an oilburning vessel, 20th January 1950 1950, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding the Boiler & Screwshaft Surveys for the Grimso, 16th January 1950 1950, Question & Answer Memo between London & Gothenburg Office regarding Grimso still being laid up, 10th January 1950 1950, Question & Answer Memo between London & Copenhagen Office regarding Demolition for Grimso, 20th November 1951 1951, Question & Answer Memo between London & Copenhagen Office regarding Grimso being laid up, 24th May 1951 1951, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Heutafelagis Kveldulfur Ltd ( Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916 )
Fiskeri A/B Grimso ( Form of Postponed Surveys for Grimso, 23rd June 1949 1949 )
Fiskeri A-B Grimso ( Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949 )
Addur Helgasson ( Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
312 ( Steel Steamer Report for Egill Skallagrimsson, 10th October 1916 1916, Report on Machinery for Egill Skallagrimsson, 21st September 1916 1916 )
351 ( Certificate of Survey of Boiler for Grimso, 15th October 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949, Report of Total Loss, Casualty, &c for Grimso, 15th May 1952 1952 )
Location of construction for a vessel’s engines.
The port in which a vessel is registered or permanently based.
Recorded information related to a vessel’s movements.
Laid up at Gothenburg ( Report of Survey for Repairs, &c, of Engines & Boilers for Grimso, 29th September 1949 1949 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.