Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Straiton ( Iron Ships Report for Grange, 13th November 1848 1848 )
John Graham ( Annual Surveys Report for Grange, 27th July 1854 1854 )
Arthur F Paterson ( Annual Surveys Report for Grange, 24th April 1855 1855 )
Thomas Roskell ( Report of Survey for Repairs for Grange, 11th April 1860 1860 )
Location where a vessel’s survey was undertaken.
Glasgow ( Iron Ships Report for Grange, 13th November 1848 1848, Annual Surveys Report for Grange, 27th July 1854 1854 )
Grangemouth ( Annual Surveys Report for Grange, 24th April 1855 1855 )
Bowling Bay; Glasgow ( Report of Survey for Repairs for Grange, 11th April 1860 1860 )
Recorded information related to a vessel’s movements.
Glasgow; Leith ( Iron Ships Report for Grange, 13th November 1848 1848 )
Glasgow; Bilboa ( Annual Surveys Report for Grange, 27th July 1854 1854 )
Grangemouth; Stettin ( Annual Surveys Report for Grange, 24th April 1855 1855 )
Bowling Bay; Coaster ( Report of Survey for Repairs for Grange, 11th April 1860 1860 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The year in which a vessel’s construction is completed.
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Forth & Clyde Canal Co ( Iron Ships Report for Grange, 13th November 1848 1848 )
Thomas Craig ( Annual Surveys Report for Grange, 27th July 1854 1854, Annual Surveys Report for Grange, 24th April 1855 1855 )
James Jeffrey ( Report of Survey for Repairs for Grange, 11th April 1860 1860 )
Name of surveyor.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
The name of the port/place of destination given.
Leith ( Iron Ships Report for Grange, 13th November 1848 1848 )
Bilboa ( Annual Surveys Report for Grange, 27th July 1854 1854 )
Stettin ( Annual Surveys Report for Grange, 24th April 1855 1855 )
Coaster ( Report of Survey for Repairs for Grange, 11th April 1860 1860 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ships Report for Grange, 13th November 1848 1848, Annual Surveys Report for Grange, 27th July 1854 1854, Annual Surveys Report for Grange, 24th April 1855 1855, Report of Survey for Repairs for Grange, 11th April 1860 1860 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
97 ( Annual Surveys Report for Grange, 24th April 1855 1855 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.